Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2020
Principal Product Refrigeration Equipment
NAICS 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585 - Refrigeration And Heating Equipment
Sales $50,000,000-$100,000,000
# of Employees 287
Plant Area (Sq.Ft.) 150,000
Annual Production 3,102 Pieces
Production Hrs. Annual 2,625
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $188,577 1,534,790 kWh $0.12
Electricity Fees $19,323 - $ -
TOTAL ENERGY COSTS $207,900
RECOMMENDED SAVINGS* $44,595 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Fees One-time Revenue or Avoided Cost
$ kWh $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$23,161
Cost:
$320
- - $23,161 - - - -
-
kWh
$23,161
-
$
-
-
$
02: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$7,650
Cost:
$4,760
$7,650 62,194 - - - - $7,650
62,194
kWh
-
-
$
-
-
$
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$4,237
Cost:
$480
$4,237 34,450 - - - - $4,237
34,450
kWh
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,360
Cost:
$1,980
$3,360 27,321 - - - - $3,360
27,321
kWh
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,170
Cost:
$1,356
$2,170 17,640 - - - - $2,170
17,640
kWh
-
-
$
-
-
$
06: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$2,000
Cost:
$160
- - - - $2,000 - -
-
kWh
-
-
$
$2,000
-
$
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,446
Cost:
$1,238
$1,446 11,760 - - - - $1,446
11,760
kWh
-
-
$
-
-
$
08: 2.4227 USE COMPRESSOR AIR FILTERS Savings:
$571
Cost:
$562
$571 4,644 - - - - $571
4,644
kWh
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$44,595
Cost:
$10,856
$19,434 158,009 $23,161 - $2,000 - $19,434
158,009
kWh
$23,161
-
$
$2,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
$
-
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Fees One-time Revenue or Avoided Cost