Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2020 |
Principal Product | Biochemicals |
NAICS | 334516 - Analytical Laboratory Instrument Manufacturing |
SIC | 3826 - Analytical Instruments |
Sales | $10,000,000-$50,000,000 |
# of Employees | 105 |
Plant Area (Sq.Ft.) | 46,000 |
Annual Production | 766,652 Pieces |
Production Hrs. Annual | 2,600 |
Location (State) | PR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $692,599 | 4,065,120 | kWh | $0.17 |
Electricity Demand | $67,307 | 8,067 | kW-months/year | $8.34 |
Electricity Fees | $6,746 | - | $ | - |
LPG | $20 | 1 | MMBtu | $20.21 |
TOTAL ENERGY COSTS | $779,507 | |||
RECOMMENDED SAVINGS* | $222,972 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $192,230 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Water Disposal | Electricity Usage | Electricity Demand | LPG | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL |
Savings: $192,230 Cost: $217,000 |
$178,214 | 1,048,320 | $14,016 | 1,680 | - | - | - | - |
$178,214 1,048,320 kWh |
$14,016 1,680 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $11,551 Cost: $2,080 |
- | - | - | - | - | - | $11,551 | 1,492 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$11,551 1,492 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.9112 USE SOLAR HEAT TO HEAT WATER |
Savings: $9,075 Cost: $12,000 |
$7,440 | 43,767 | $1,635 | 196 | - | - | - | - |
$7,440 43,767 kWh |
$1,635 196 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,846 Cost: $1,980 |
$4,537 | 26,685 | $309 | 37 | - | - | - | - |
$4,537 26,685 kWh |
$309 37 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $3,953 Cost: $5,914 |
$4,004 | 23,550 | $1,572 | 188 | $(-1,623) | (-80) | - | - |
$4,004 23,550 kWh |
$1,572 188 kW-months/year |
$(-1,623) (-80) MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,317 Cost: $2,100 |
$1,234 | 7,256 | $83 | 10 | - | - | - | - |
$1,234 7,256 kWh |
$83 10 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $222,972 Cost: $241,074 |
$195,429 | 1,149,578 | $17,615 | 2,111 | $(-1,623) | (-80) | $11,551 | 1,492 | $195,429 1,149,578 kWh |
$17,615 2,111 kW-months/year |
$(-1,623) (-80) MMBtu |
$11,551 1,492 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $192,230 Cost: $217,000 |
$178,214 | 1,048,320 | $14,016 | 1,680 | - | - | - | - | $178,214 1,048,320 kWh |
$14,016 1,680 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Water Disposal | Electricity Usage | Electricity Demand | LPG | Water Disposal |