IAC logo
IAC Assessment: MI0394
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0394
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2021
Principal Product Landing Gear/ Aircraft
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $100,000,000-$500,000,000
# of Employees 192
Plant Area (Sq.Ft.) 100,000
Annual Production 1,200 Pieces
Production Hrs. Annual 6,240
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $280,621 6,943,183 kWh $0.04
Electricity Demand $219,647 13,106 kW-months/year $16.76
Electricity Fees $85,160 - $ -
Natural Gas $3,073 230 MMBtu $13.36
TOTAL ENERGY COSTS $607,539
RECOMMENDED SAVINGS* $58,900 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,257
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$24,463
Cost:
$480
$15,463 386,564 $9,000 537 - - - - - - $15,463
386,564
kWh
$9,000
537
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
02: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$12,537
Cost:
$1,380
- - - - - - - - $12,537 1,088 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$12,537
1,088
Tgal
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$9,170
Cost:
$2,549
- - - - $9,170 - - - - - -
-
kWh
-
-
kW-months/year
$9,170
-
$
-
-
MMBtu
-
-
Tgal
04: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$4,060
Cost:
$14,609
$2,250 56,249 $1,810 108 - - - - - - $2,250
56,249
kWh
$1,810
108
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,836
Cost:
$2,100
$2,580 64,496 $256 15 - - - - - - $2,580
64,496
kWh
$256
15
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,427
Cost:
$1,980
$1,539 38,466 $888 53 - - - - - - $1,539
38,466
kWh
$888
53
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
07: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$2,040
Cost:
$616
$695 17,370 $553 33 - - $792 59 - - $695
17,370
kWh
$553
33
kW-months/year
-
-
$
$792
59
MMBtu
-
-
Tgal
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,367
Cost:
$2,549
$747 18,682 $620 37 - - - - - - $747
18,682
kWh
$620
37
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$58,900
Cost:
$26,263
$23,274 581,827 $13,127 783 $9,170 - $792 59 $12,537 1,088 $23,274
581,827
kWh
$13,127
783
kW-months/year
$9,170
-
$
$792
59
MMBtu
$12,537
1,088
Tgal
TOTAL IMPLEMENTED Savings:
$28,257
Cost:
$5,009
$17,749 443,712 $10,508 627 - - - - - - $17,749
443,712
kWh
$10,508
627
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal