IAC logo
IAC Assessment: MI0399
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0399
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2021
Principal Product Cartridge valves
NAICS 332919 - Other Metal Valve and Pipe Fitting Manufacturing
SIC 3492 - Fluid Power Valves & Hose Fittings
Sales $100,000,000-$500,000,000
# of Employees 430
Plant Area (Sq.Ft.) 160,000
Annual Production 5,000,000 Pieces
Production Hrs. Annual 7,488
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $535,395 11,654,080 kWh $0.05
Electricity Demand $255,395 20,520 kW-months/year $12.45
Electricity Fees $43,803 - $ -
Natural Gas $18,648 4,418 MMBtu $4.22
TOTAL ENERGY COSTS $861,569
RECOMMENDED SAVINGS* $223,142 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $103,016
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$115,960
Cost:
$157,500
$106,213 2,308,982 $43,013 3,456 $(-33,266) (-7,881) - - $106,213
2,308,982
kWh
$43,013
3,456
kW-months/year
$(-33,266)
(-7,881)
MMBtu
-
-
Tgal
02: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$54,060
Cost:
$240,000
$35,690 775,869 $18,370 1,476 - - - - $35,690
775,869
kWh
$18,370
1,476
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$21,020
Cost:
$320
$15,245 331,421 $5,775 464 - - - - $15,245
331,421
kWh
$5,775
464
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$15,245
Cost:
$70,400
$11,200 243,478 $4,045 325 - - - - $11,200
243,478
kWh
$4,045
325
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,405
Cost:
$1,670
$7,957 172,977 $3,448 277 - - - - $7,957
172,977
kWh
$3,448
277
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 3.4155 METER WASTE WATER Savings:
$4,166
Cost:
$900
- - - - - - $4,166 636 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,166
636
Tgal
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,286
Cost:
$4,468
$1,286 27,961 - - - - - - $1,286
27,961
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$223,142
Cost:
$475,258
$177,591 3,860,688 $74,651 5,998 $(-33,266) (-7,881) $4,166 636 $177,591
3,860,688
kWh
$74,651
5,998
kW-months/year
$(-33,266)
(-7,881)
MMBtu
$4,166
636
Tgal
TOTAL IMPLEMENTED Savings:
$103,016
Cost:
$316,858
$71,378 1,551,706 $31,638 2,542 - - - - $71,378
1,551,706
kWh
$31,638
2,542
kW-months/year
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal