Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2022 |
Principal Product | Chemical and organic extracts |
NAICS | 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 2899 - Chemical Preparations, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 180 |
Plant Area (Sq.Ft.) | 125,000 |
Annual Production | 9,800,000 Pounds |
Production Hrs. Annual | 8,736 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $238,130 | 4,824,554 | kWh | $0.05 |
Electricity Demand | $64,778 | 6,643 | kW-months/year | $9.75 |
Electricity Fees | $64,767 | - | $ | - |
Natural Gas | $43,107 | 11,053 | MMBtu | $3.90 |
TOTAL ENERGY COSTS | $443,220 | |||
RECOMMENDED SAVINGS* | $51,753 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $36,328 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $28,220 Cost: $580 |
$22,165 | 452,343 | $6,055 | 621 | - | - | - | - |
$22,165 452,343 kWh |
$6,055 621 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $9,764 Cost: $479 |
$7,404 | 151,093 | $2,360 | 242 | - | - | - | - |
$7,404 151,093 kWh |
$2,360 242 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.4155 METER WASTE WATER |
Savings: $8,108 Cost: $1,533 |
- | - | - | - | - | - | $8,108 | 1,485 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$8,108 1,485 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,549 Cost: $1,660 |
$1,652 | 33,723 | $897 | 92 | - | - | - | - |
$1,652 33,723 kWh |
$897 92 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN |
Savings: $1,720 Cost: $2,088 |
- | - | - | - | $978 | 251 | $742 | 136 |
- - kWh |
- - kW-months/year |
$978 251 MMBtu |
$742 136 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,392 Cost: $2,520 |
- | - | - | - | $1,392 | 357 | - | - |
- - kWh |
- - kW-months/year |
$1,392 357 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $51,753 Cost: $8,860 |
$31,221 | 637,159 | $9,312 | 955 | $2,370 | 608 | $8,850 | 1,621 | $31,221 637,159 kWh |
$9,312 955 kW-months/year |
$2,370 608 MMBtu |
$8,850 1,621 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $36,328 Cost: $2,113 |
$22,165 | 452,343 | $6,055 | 621 | - | - | $8,108 | 1,485 | $22,165 452,343 kWh |
$6,055 621 kW-months/year |
- - MMBtu |
$8,108 1,485 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal |