IAC Assessment: MI0404
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0404
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2022
Principal Product Chemical and organic extracts
NAICS 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899 - Chemical Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 125,000
Annual Production 9,800,000 Pounds
Production Hrs. Annual 8,736
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $238,130 4,824,554 kWh $0.05
Electricity Demand $64,778 6,643 kW-months/year $9.75
Electricity Fees $64,767 - $ -
Natural Gas $43,107 11,053 MMBtu $3.90
TOTAL ENERGY COSTS $443,220
RECOMMENDED SAVINGS* $51,753 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,328
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$28,220
Cost:
$580
$22,165 452,343 $6,055 621 - - - - $22,165
452,343
kWh
$6,055
621
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$9,764
Cost:
$479
$7,404 151,093 $2,360 242 - - - - $7,404
151,093
kWh
$2,360
242
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 3.4155 METER WASTE WATER Savings:
$8,108
Cost:
$1,533
- - - - - - $8,108 1,485 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$8,108
1,485
Tgal
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,549
Cost:
$1,660
$1,652 33,723 $897 92 - - - - $1,652
33,723
kWh
$897
92
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$1,720
Cost:
$2,088
- - - - $978 251 $742 136 -
-
kWh
-
-
kW-months/year
$978
251
MMBtu
$742
136
Tgal
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,392
Cost:
$2,520
- - - - $1,392 357 - - -
-
kWh
-
-
kW-months/year
$1,392
357
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$51,753
Cost:
$8,860
$31,221 637,159 $9,312 955 $2,370 608 $8,850 1,621 $31,221
637,159
kWh
$9,312
955
kW-months/year
$2,370
608
MMBtu
$8,850
1,621
Tgal
TOTAL IMPLEMENTED Savings:
$36,328
Cost:
$2,113
$22,165 452,343 $6,055 621 - - $8,108 1,485 $22,165
452,343
kWh
$6,055
621
kW-months/year
-
-
MMBtu
$8,108
1,485
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal