Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2022
Principal Product Plastic Packaging
NAICS 311999 - All Other Miscellaneous Food Manufacturing
SIC 2099 - Food Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 50,000
Annual Production 1,300,000 Units
Production Hrs. Annual 8,736
Location (State) PR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $995,504 3,809,400 kWh $0.26
Electricity Demand $56,820 6,312 kW-months/year $9.00
Electricity Fees $2,380 - $ -
LPG $467,692 20,805 MMBtu $22.48
Fuel Oil #2 $15,805 490 MMBtu $32.26
TOTAL ENERGY COSTS $1,538,201
RECOMMENDED SAVINGS* $257,876 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,767
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees LPG Fuel Oil #2 Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees LPG Fuel Oil #2 Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$10,535
Cost:
$3,084
$10,535 40,363 - - - - - - - - - - $10,535
40,363
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$10,767
Cost:
$960
$10,282 39,393 $485 54 - - - - - - - - $10,282
39,393
kWh
$485
54
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.1224 REPLACE BOILER Savings:
$73,846
Cost:
$170,000
- - - - - - $73,846 3,285 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$73,846
3,285
MMBtu
-
-
MMBtu
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,830
Cost:
$7,950
- - $4,830 537 - - - - - - - - -
-
kWh
$4,830
537
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$142,120
Cost:
$2,400
- - - - $142,120 - - - - - - - -
-
kWh
-
-
kW-months/year
$142,120
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.8226 INCREASE EFFICIENCY OF TRUCKS Savings:
$15,778
Cost:
$12,180
- - - - - - - - $7,903 245 $7,875 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$7,903
245
MMBtu
$7,875
-
$
TOTAL RECOMMENDED Savings:
$257,876
Cost:
$196,574
$20,817 79,756 $5,315 591 $142,120 - $73,846 3,285 $7,903 245 $7,875 - $20,817
79,756
kWh
$5,315
591
kW-months/year
$142,120
-
$
$73,846
3,285
MMBtu
$7,903
245
MMBtu
$7,875
-
$
TOTAL IMPLEMENTED Savings:
$10,767
Cost:
$960
$10,282 39,393 $485 54 - - - - - - - - $10,282
39,393
kWh
$485
54
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees LPG Fuel Oil #2 Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees LPG Fuel Oil #2 Ancillary Material Cost