IAC Assessment: MI0438
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0438
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2024
Principal Product Landing Gears
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $100,000,000-$500,000,000
# of Employees 220
Plant Area (Sq.Ft.) 100,000
Annual Production 1,200 Pieces
Production Hrs. Annual 7,000
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $484,913 8,869,200 kWh $0.05
Electricity Demand $312,033 16,674 kW-months/year $18.71
Electricity Fees $134,214 - $ -
Natural Gas $18,015 1,155 MMBtu $15.60
TOTAL ENERGY COSTS $978,158
RECOMMENDED SAVINGS* $508,032 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$292,161
Cost:
$663,964
$80,524 1,464,073 $211,637 11,309 - - - - - - $80,524
1,464,073
kWh
$211,637
11,309
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$116,907
Cost:
-
- - - - - - - - $116,907 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$116,907
-
$
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$52,928
Cost:
$1,320
$38,107 692,862 $14,821 792 - - - - - - $38,107
692,862
kWh
$14,821
792
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 3.4155 METER WASTE WATER Savings:
$26,088
Cost:
$956
- - - - - - $26,088 1,757 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$26,088
1,757
Tgal
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,979
Cost:
$1,660
$3,771 68,568 $2,208 118 - - - - - - $3,771
68,568
kWh
$2,208
118
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$9,248
Cost:
$860
$5,841 106,199 $3,407 182 - - - - - - $5,841
106,199
kWh
$3,407
182
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$2,582
Cost:
$1,027
$884 16,079 $842 45 $856 55 - - - - $884
16,079
kWh
$842
45
kW-months/year
$856
55
MMBtu
-
-
Tgal
-
-
$
08: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$2,139
Cost:
$40
$1,351 24,570 $788 42 - - - - - - $1,351
24,570
kWh
$788
42
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$508,032
Cost:
$669,827
$130,478 2,372,351 $233,703 12,488 $856 55 $26,088 1,757 $116,907 - $130,478
2,372,351
kWh
$233,703
12,488
kW-months/year
$856
55
MMBtu
$26,088
1,757
Tgal
$116,907
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes