IAC logo
IAC Assessment: MI0440
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0440
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2024
Principal Product Tortillas & Nacho chips
NAICS 311830 - Tortilla Manufacturing
SIC 2099 - Food Preparations, Nec
Sales $50,000,000-$100,000,000
# of Employees 330
Plant Area (Sq.Ft.) 150,000
Annual Production 72,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $765,739 8,260,760 kWh $0.09
Electricity Demand $244,545 19,427 kW-months/year $12.59
Electricity Fees $76,091 - $ -
Natural Gas $249,325 51,405 MMBtu $4.85
TOTAL ENERGY COSTS $1,418,067
RECOMMENDED SAVINGS* $385,660 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$211,950
Cost:
$698,434
$105,203 1,131,217 $111,547 8,861 $(-4,800) - - - $105,203
1,131,217
kWh
$111,547
8,861
kW-months/year
$(-4,800)
-
$
-
-
$
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$21,169
Cost:
$1,320
$17,821 191,619 $3,348 266 - - - - $17,821
191,619
kWh
$3,348
266
kW-months/year
-
-
$
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$19,242
Cost:
$860
$18,839 202,566 $403 32 - - - - $18,839
202,566
kWh
$403
32
kW-months/year
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$18,986
Cost:
$1,980
$15,071 162,056 $3,915 311 - - - - $15,071
162,056
kWh
$3,915
311
kW-months/year
-
-
$
-
-
$
05: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$18,769
Cost:
$74,097
$14,892 160,134 $3,877 308 - - - - $14,892
160,134
kWh
$3,877
308
kW-months/year
-
-
$
-
-
$
06: 4.812 APPLY FOR INVESTMENT INCENTIVES Savings:
$74,097
Cost:
-
- - - - - - $74,097 - -
-
kWh
-
-
kW-months/year
-
-
$
$74,097
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$10,491
Cost:
$1,720
$8,324 89,502 $2,167 172 - - - - $8,324
89,502
kWh
$2,167
172
kW-months/year
-
-
$
-
-
$
08: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$8,533
Cost:
$42,540
$6,771 72,807 $1,762 140 - - - - $6,771
72,807
kWh
$1,762
140
kW-months/year
-
-
$
-
-
$
09: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,423
Cost:
$279
$1,932 20,773 $491 39 - - - - $1,932
20,773
kWh
$491
39
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$385,660
Cost:
$821,230
$188,853 2,030,674 $127,510 10,130 $(-4,800) - $74,097 - $188,853
2,030,674
kWh
$127,510
10,130
kW-months/year
$(-4,800)
-
$
$74,097
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost