Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2024 |
Principal Product | Peptones and Amino Acids |
NAICS | 325199 - All Other Basic Organic Chemical Manufacturing |
SIC | 2869 - Industrial Organic Chemicals, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 77,897 |
Annual Production | 500,000 Pounds |
Production Hrs. Annual | 5,880 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $166,500 | 2,676,960 | kWh | $0.06 |
Electricity Demand | $98,908 | 6,576 | kW-months/year | $15.04 |
Electricity Fees | $54,311 | - | $ | - |
Natural Gas | $130,778 | 45,182 | MMBtu | $2.89 |
TOTAL ENERGY COSTS | $625,716 | |||
RECOMMENDED SAVINGS* | $110,453 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL |
Savings: $58,244 Cost: $186,000 |
$38,957 | 628,337 | $19,287 | 1,282 | - | - | - | - | - | - |
$38,957 628,337 kWh |
$19,287 1,282 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $24,362 Cost: $840 |
$16,615 | 267,977 | $8,227 | 547 | - | - | - | - | $(-480) | - |
$16,615 267,977 kWh |
$8,227 547 kW-months/year |
- - MMBtu |
- - Tgal |
$(-480) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $21,427 Cost: $1,306 |
- | - | - | - | - | - | $21,427 | 1,440 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$21,427 1,440 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,377 Cost: $510 |
$1,760 | 28,380 | $617 | 41 | - | - | - | - | - | - |
$1,760 28,380 kWh |
$617 41 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.9112 USE SOLAR HEAT TO HEAT WATER |
Savings: $2,247 Cost: $2,602 |
- | - | - | - | $3,847 | 1,331 | - | - | $(-1,600) | - |
- - kWh |
- - kW-months/year |
$3,847 1,331 MMBtu |
- - Tgal |
$(-1,600) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,124 Cost: $1,980 |
$831 | 13,407 | $293 | 20 | - | - | - | - | - | - |
$831 13,407 kWh |
$293 20 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $671 Cost: $1,203 |
$671 | 10,821 | - | - | - | - | - | - | - | - |
$671 10,821 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $110,453 Cost: $194,441 |
$58,834 | 948,922 | $28,424 | 1,890 | $3,847 | 1,331 | $21,427 | 1,440 | $(-2,080) | - | $58,834 948,922 kWh |
$28,424 1,890 kW-months/year |
$3,847 1,331 MMBtu |
$21,427 1,440 Tgal |
$(-2,080) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes |