IAC logo
IAC Assessment: MI0447
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0447
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2024
Principal Product Fabricated Metal Parts
NAICS 332710 - Machine Shops
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 78,000
Annual Production 100,220 Pieces
Production Hrs. Annual 8,008
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $163,959 2,411,040 kWh $0.07
Electricity Demand $65,994 5,184 kW-months/year $12.73
Electricity Fees $38,135 - $ -
TOTAL ENERGY COSTS $271,636
RECOMMENDED SAVINGS* $648,732 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Increase in Production Electricity Usage Electricity Demand Personnel Changes Increase in Production
$ kWh $ kW-months/year $ $ $ %
01: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$636,028
Cost:
$600,000
$(-6,920) (-101,764) $7,180 564 - - $635,768 - $(-6,920)
(-101,764)
kWh
$7,180
564
kW-months/year
-
-
$
$635,768
-
%
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$5,522
Cost:
$700
$4,687 68,929 $1,315 103 $(-480) - - - $4,687
68,929
kWh
$1,315
103
kW-months/year
$(-480)
-
$
-
-
%
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,651
Cost:
$7,497
$2,065 30,347 $586 46 - - - - $2,065
30,347
kWh
$586
46
kW-months/year
-
-
$
-
-
%
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,899
Cost:
$1,980
$1,511 22,216 $388 31 - - - - $1,511
22,216
kWh
$388
31
kW-months/year
-
-
$
-
-
%
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,840
Cost:
$3,750
$1,458 21,840 $382 30 - - - - $1,458
21,840
kWh
$382
30
kW-months/year
-
-
$
-
-
%
06: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$792
Cost:
$320
$160 2,359 $632 50 - - - - $160
2,359
kWh
$632
50
kW-months/year
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$648,732
Cost:
$614,247
$2,961 43,927 $10,483 824 $(-480) - $635,768 - $2,961
43,927
kWh
$10,483
824
kW-months/year
$(-480)
-
$
$635,768
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ %
Electricity Usage Electricity Demand Personnel Changes Increase in Production Electricity Usage Electricity Demand Personnel Changes Increase in Production