IAC logo
IAC Assessment: MO0220
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0220
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1997
Principal Product Custom Sewing-Tents, Awning, Backpacks, and Covers
NAICS n/a
SIC 2394 - Canvas And Related Products
Sales $5,000,000-$10,000,000
# of Employees 110
Plant Area (Sq.Ft.) 160,000
Annual Production 300,000 Pieces
Production Hrs. Annual 2,340
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $42,845 1,465,416 kWh $0.03
Electricity Demand $6,277 370 kW-months/year $16.96
Electricity Fees $8,670 - $ -
Natural Gas $41,879 7,993 MMBtu $5.24
TOTAL ENERGY COSTS $107,471
RECOMMENDED SAVINGS* $31,879 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,231
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $
01: 4.4320 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$13,800
Cost:
$25,000
- - - - - - $13,800 - -
-
kWh
-
-
kW-months/year
-
-
lb
$13,800
-
$
02: 4.5220 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE Savings:
$8,000
Cost:
$15,000
- - - - - - $8,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$8,000
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$516
Cost:
$80
$419 12,016 $97 6 - - - - $419
12,016
kWh
$97
6
kW-months/year
-
-
lb
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$39
Cost:
$51
$32 879 $7 1 - - - - $32
879
kWh
$7
1
kW-months/year
-
-
lb
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$76
Cost:
-
$62 1,758 $14 1 - - - - $62
1,758
kWh
$14
1
kW-months/year
-
-
lb
-
-
$
06: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$7,800
Cost:
$3,040
- - - - $7,800 507 - - -
-
kWh
-
-
kW-months/year
$7,800
507
lb
-
-
$
07: 3.7196 USE RE-USABLE FILTERS Savings:
$1,648
Cost:
$2,231
- - - - $1,648 432 - - -
-
kWh
-
-
kW-months/year
$1,648
432
lb
-
-
$
TOTAL RECOMMENDED Savings:
$31,879
Cost:
$45,402
$513 14,653 $118 8 $9,448 939 $21,800 - $513
14,653
kWh
$118
8
kW-months/year
$9,448
939
lb
$21,800
-
$
TOTAL IMPLEMENTED Savings:
$30,231
Cost:
$43,171
$513 14,653 $118 8 $7,800 507 $21,800 - $513
14,653
kWh
$118
8
kW-months/year
$7,800
507
lb
$21,800
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost