IAC Assessment: MO0263
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0263
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1999
Principal Product Plastic Injected Molding - Telephone Parts
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 215
Plant Area (Sq.Ft.) 91,000
Annual Production 460,000 Pieces
Production Hrs. Annual 8,400
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $288,774 5,985,053 kWh $0.05
Electricity Demand $28,256 1,308 kW-months/year $21.60
Electricity Fees $39,062 - $ -
Natural Gas $9,429 1,942 MMBtu $4.86
TOTAL ENERGY COSTS $393,685
RECOMMENDED SAVINGS* $81,666 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,233
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,337
Cost:
$100
$1,257 22,860 $80 4 - - - - - - $1,257
22,860
kWh
$80
4
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$696
Cost:
$80
$653 12,016 $43 2 - - - - - - $653
12,016
kWh
$43
2
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,679
Cost:
$5,556
$2,677 48,945 $2,002 93 - - - - - - $2,677
48,945
kWh
$2,002
93
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$19,200
Cost:
-
- - - - $19,200 40,000 - - - - -
-
kWh
-
-
kW-months/year
$19,200
40,000
lb
-
-
$
-
-
$
05: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$54,600
Cost:
$695
- - - - - - $54,600 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$54,600
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,154
Cost:
$1,696
- - - - - - - - $1,154 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$1,154
-
$
TOTAL RECOMMENDED Savings:
$81,666
Cost:
$8,127
$4,587 83,821 $2,125 99 $19,200 40,000 $54,600 - $1,154 - $4,587
83,821
kWh
$2,125
99
kW-months/year
$19,200
40,000
lb
$54,600
-
$
$1,154
-
$
TOTAL IMPLEMENTED Savings:
$21,233
Cost:
$180
$1,910 34,876 $123 6 $19,200 40,000 - - - - $1,910
34,876
kWh
$123
6
kW-months/year
$19,200
40,000
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost