IAC logo
IAC Assessment: MS0048
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0048
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1996
Principal Product Office partitions
NAICS n/a
SIC 2542 - Partitions And Fixtures, Except Wood
Sales $50,000,000-$100,000,000
# of Employees 125
Plant Area (Sq.Ft.) 257,000
Annual Production 200,000 Pieces
Production Hrs. Annual 2,080
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $147,407 4,752,052 kWh $0.03
Electricity Demand $138,893 15,524 kW-months/year $8.95
Electricity Fees $(-50,066) - $ -
Natural Gas $37,047 12,038 MMBtu $3.08
TOTAL ENERGY COSTS $307,636
RECOMMENDED SAVINGS* $53,534 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,011
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ lb $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,277
Cost:
$3,000
- - - - $4,277 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$4,277
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$16,746
Cost:
$10,140
$8,450 272,274 $11,664 1,200 - - $(-3,368) (-929) - - - - - - $8,450
272,274
kWh
$11,664
1,200
kW-months/year
-
-
$
$(-3,368)
(-929)
MMBtu
-
-
gal
-
-
lb
-
-
$
03: 2.2514 COVER OPEN TANKS Savings:
$127
Cost:
$304
- - - - - - $127 41 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$127
41
MMBtu
-
-
gal
-
-
lb
-
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$2,734
Cost:
$400
$975 31,360 $1,759 181 - - - - - - - - - - $975
31,360
kWh
$1,759
181
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,749
Cost:
$1,440
- - - - - - $2,749 892 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,749
892
MMBtu
-
-
gal
-
-
lb
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,099
Cost:
$300
$390 12,603 $709 73 - - - - - - - - - - $390
12,603
kWh
$709
73
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$11,000
Cost:
$6,500
- - - - - - - - - - $11,000 220,000 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$11,000
220,000
lb
-
-
$
08: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$14,802
Cost:
-
$(-172) (-5,569) $(-117) (-12) - - - - $17,691 - - - $(-2,600) - $(-172)
(-5,569)
kWh
$(-117)
(-12)
kW-months/year
-
-
$
-
-
MMBtu
$17,691
-
gal
-
-
lb
$(-2,600)
-
$
TOTAL RECOMMENDED Savings:
$53,534
Cost:
$22,084
$9,643 310,668 $14,015 1,442 $4,277 - $(-492) 4 $17,691 - $11,000 220,000 $(-2,600) - $9,643
310,668
kWh
$14,015
1,442
kW-months/year
$4,277
-
$
$(-492)
4
MMBtu
$17,691
-
gal
$11,000
220,000
lb
$(-2,600)
-
$
TOTAL IMPLEMENTED Savings:
$7,011
Cost:
$3,400
$975 31,360 $1,759 181 $4,277 - - - - - - - - - $975
31,360
kWh
$1,759
181
kW-months/year
$4,277
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes