IAC logo
IAC Assessment: MS0059
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0059
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1996
Principal Product copper tube
NAICS n/a
SIC 3351 - Copper Rolling And Drawing
Sales $10,000,000-$50,000,000
# of Employees 172
Plant Area (Sq.Ft.) 151,391
Annual Production 16,900,000 Pounds
Production Hrs. Annual 8,568
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $387,190 15,406,214 kWh $0.03
Electricity Demand $216,232 34,692 kW-months/year $6.23
Electricity Fees $55,674 - $ -
Natural Gas $133,673 33,281 MMBtu $4.02
TOTAL ENERGY COSTS $(-2,787,721)
RECOMMENDED SAVINGS* $168,866 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,347
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Other Liquid (haz) Ancillary Material Cost Electricity Usage Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Other Liquid (haz) Ancillary Material Cost
$ kWh $ $ $ MMBtu $ Tgal $ gal $ gal $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,983
Cost:
$2,422
- - - - $6,983 1,363 - - - - - - - - -
-
kWh
-
-
$
$6,983
1,363
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
$
02: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$26,347
Cost:
$1,000
- - - - $26,347 6,426 - - - - - - - - -
-
kWh
-
-
$
$26,347
6,426
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$9,183
Cost:
$18,000
- - $9,183 - - - - - - - - - - - -
-
kWh
$9,183
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,807
Cost:
$1,160
$612 28,429 - - $1,195 291 - - - - - - - - $612
28,429
kWh
-
-
$
$1,195
291
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
$
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$35,986
Cost:
$23,018
- - - - $(-4,852) (-1,470) - - - - $40,838 54,450 - - -
-
kWh
-
-
$
$(-4,852)
(-1,470)
MMBtu
-
-
Tgal
-
-
gal
$40,838
54,450
gal
-
-
$
06: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$88,560
Cost:
-
- - - - - - $(-11) (-7,600) $13,704 1,200 $26,479 4,500 $48,388 - -
-
kWh
-
-
$
-
-
MMBtu
$(-11)
(-7,600)
Tgal
$13,704
1,200
gal
$26,479
4,500
gal
$48,388
-
$
TOTAL RECOMMENDED Savings:
$168,866
Cost:
$45,600
$612 28,429 $9,183 - $29,673 6,610 $(-11) (-7,600) $13,704 1,200 $67,317 58,950 $48,388 - $612
28,429
kWh
$9,183
-
$
$29,673
6,610
MMBtu
$(-11)
(-7,600)
Tgal
$13,704
1,200
gal
$67,317
58,950
gal
$48,388
-
$
TOTAL IMPLEMENTED Savings:
$26,347
Cost:
$1,000
- - - - $26,347 6,426 - - - - - - - - -
-
kWh
-
-
$
$26,347
6,426
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
$
Savings
Cost
$ kWh $ $ $ MMBtu $ Tgal $ gal $ gal $ $
Electricity Usage Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Other Liquid (haz) Ancillary Material Cost Electricity Usage Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Other Liquid (haz) Ancillary Material Cost