IAC logo
IAC Assessment: MS0065
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0065
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1996
Principal Product household lamps
NAICS n/a
SIC 3645 - Residential Lighting Fixtures
Sales $5,000,000-$10,000,000
# of Employees 65
Plant Area (Sq.Ft.) 100,940
Annual Production 120,000 Pieces
Production Hrs. Annual 4,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $45,880 686,987 kWh $0.07
Electricity Fees $(-2,648) - $ -
Natural Gas $40,220 8,327 MMBtu $4.83
TOTAL ENERGY COSTS $87,054
RECOMMENDED SAVINGS* $12,915 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Water Consumption Electricity Usage Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Water Consumption
$ kWh $ $ $ MMBtu $ Tgal $ lb $ $ $ Tgal
01: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$269
Cost:
-
$303 7,034 $(-34) - - - - - - - - - - - $303
7,034
kWh
$(-34)
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$699
Cost:
$441
$787 18,171 $(-88) - - - - - - - - - - - $787
18,171
kWh
$(-88)
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,380
Cost:
$4,484
- - - - $2,230 523 $75 38,617 - - - - $75 - -
-
kWh
-
-
$
$2,230
523
MMBtu
$75
38,617
Tgal
-
-
lb
-
-
$
$75
-
Tgal
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,297
Cost:
$2,580
- - - - $2,297 538 - - - - - - - - -
-
kWh
-
-
$
$2,297
538
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
05: 3.7196 USE RE-USABLE FILTERS Savings:
$270
Cost:
$450
- - - - - - - - - 14 $270 - - - -
-
kWh
-
-
$
-
-
MMBtu
-
-
Tgal
-
14
lb
$270
-
$
-
-
Tgal
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$7,000
Cost:
$20,494
- - - - - - - - $7,000 700,000 - - - - -
-
kWh
-
-
$
-
-
MMBtu
-
-
Tgal
$7,000
700,000
lb
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$12,915
Cost:
$28,449
$1,090 25,205 $(-122) - $4,527 1,061 $75 38,617 $7,000 700,014 $270 - $75 - $1,090
25,205
kWh
$(-122)
-
$
$4,527
1,061
MMBtu
$75
38,617
Tgal
$7,000
700,014
lb
$270
-
$
$75
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ $ $ MMBtu $ Tgal $ lb $ $ $ Tgal
Electricity Usage Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Water Consumption Electricity Usage Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Water Consumption