IAC logo
IAC Assessment: MS0080
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0080
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1997
Principal Product Industrial and Commercial Machinery
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $5,000,000-$10,000,000
# of Employees 63
Plant Area (Sq.Ft.) 80,000
Annual Production 4,500,000 Pounds
Production Hrs. Annual 2,250
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $36,593 702,814 kWh $0.05
Electricity Demand $11,384 3,818 kW-months/year $2.98
Electricity Fees $15,021 - $ -
LPG $20,560 2,249 MMBtu $9.14
TOTAL ENERGY COSTS $70,668
RECOMMENDED SAVINGS* $116,190 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $98,899
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.7134 USE PHOTOCELL CONTROLS Savings:
$2,171
Cost:
$698
$1,818 38,101 - - $353 - - - - - $1,818
38,101
kWh
-
-
kW-months/year
$353
-
$
-
-
$
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$15,115
Cost:
-
$8,495 177,902 $3,407 1,296 $3,213 - - - - - $8,495
177,902
kWh
$3,407
1,296
kW-months/year
$3,213
-
$
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,984
Cost:
$53
$3,336 69,754 - - $648 - - - - - $3,336
69,754
kWh
-
-
kW-months/year
$648
-
$
-
-
$
-
-
$
04: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$79,800
Cost:
$6,490
- - - - - - $79,800 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$79,800
-
$
-
-
$
05: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$15,120
Cost:
$2,303
- - - - - - - - $15,120 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$15,120
-
$
TOTAL RECOMMENDED Savings:
$116,190
Cost:
$9,544
$13,649 285,757 $3,407 1,296 $4,214 - $79,800 - $15,120 - $13,649
285,757
kWh
$3,407
1,296
kW-months/year
$4,214
-
$
$79,800
-
$
$15,120
-
$
TOTAL IMPLEMENTED Savings:
$98,899
Cost:
$6,543
$11,831 247,656 $3,407 1,296 $3,861 - $79,800 - - - $11,831
247,656
kWh
$3,407
1,296
kW-months/year
$3,861
-
$
$79,800
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost Primary Product