IAC logo
IAC Assessment: MS0083
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0083
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1997
Principal Product absorbants and turf enhancements
NAICS n/a
SIC 3295 - Minerals, Ground Or Treated
Sales $10,000,000-$50,000,000
# of Employees 56
Plant Area (Sq.Ft.) 120,000
Annual Production 85,000 Tons
Production Hrs. Annual 6,240
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $193,255 5,723,623 kWh $0.03
Electricity Demand $97,891 11,899 kW-months/year $8.23
Electricity Fees $4,505 - $ -
Natural Gas $897,661 272,845 MMBtu $3.29
TOTAL ENERGY COSTS $1,205,517
RECOMMENDED SAVINGS* $611,357 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,737
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Increase in Production Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Increase in Production
$ kWh $ kW-months/year $ MMBtu $ gal $ %
01: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$2,061
Cost:
$200
$1,320 41,911 $741 81 - - - - - - $1,320
41,911
kWh
$741
81
kW-months/year
-
-
MMBtu
-
-
gal
-
-
%
02: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$118,026
Cost:
$75,928
- - - - $118,026 35,874 - - - - -
-
kWh
-
-
kW-months/year
$118,026
35,874
MMBtu
-
-
gal
-
-
%
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$9,737
Cost:
$12,878
- - - - $9,737 2,970 - - - - -
-
kWh
-
-
kW-months/year
$9,737
2,970
MMBtu
-
-
gal
-
-
%
04: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$1,022
Cost:
$1,995
$857 13,482 - - - - $165 1,200 - - $857
13,482
kWh
-
-
kW-months/year
-
-
MMBtu
$165
1,200
gal
-
-
%
05: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$480,511
Cost:
$9,400
- - - - - - - - $480,511 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$480,511
-
%
TOTAL RECOMMENDED Savings:
$611,357
Cost:
$100,401
$2,177 55,393 $741 81 $127,763 38,844 $165 1,200 $480,511 - $2,177
55,393
kWh
$741
81
kW-months/year
$127,763
38,844
MMBtu
$165
1,200
gal
$480,511
-
%
TOTAL IMPLEMENTED Savings:
$9,737
Cost:
$12,878
- - - - $9,737 2,970 - - - - -
-
kWh
-
-
kW-months/year
$9,737
2,970
MMBtu
-
-
gal
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ %
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Increase in Production Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Increase in Production