IAC logo
IAC Assessment: MS0100
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0100
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1997
Principal Product Foam
NAICS n/a
SIC 3086 - Plastics Foam Products
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 369,000
Annual Production 144,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $100,840 3,250,879 kWh $0.03
Electricity Demand $73,091 8,382 kW-months/year $8.72
Electricity Fees $2,609 - $ -
Natural Gas $21,037 4,069 MMBtu $5.17
TOTAL ENERGY COSTS $210,241
RECOMMENDED SAVINGS* $52,296 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $49,787
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$393
Cost:
$688
$393 12,603 - - - - - - - - $393
12,603
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,900
Cost:
$130
$1,782 57,444 $1,118 115 - - - - - - $1,782
57,444
kWh
$1,118
115
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,509
Cost:
$6,600
- - - - $2,509 340 - - - - -
-
kWh
-
-
kW-months/year
$2,509
340
MMBtu
-
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$11,663
Cost:
$4,770
- - - - $11,663 1,580 - - - - -
-
kWh
-
-
kW-months/year
$11,663
1,580
MMBtu
-
-
$
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$7,250
Cost:
$6,500
- - - - - - - - $7,250 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$7,250
-
$
06: 4.3220 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$27,581
Cost:
$3,182
- - - - - - $16,911 - $10,670 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$16,911
-
$
$10,670
-
$
TOTAL RECOMMENDED Savings:
$52,296
Cost:
$21,870
$2,175 70,047 $1,118 115 $14,172 1,920 $16,911 - $17,920 - $2,175
70,047
kWh
$1,118
115
kW-months/year
$14,172
1,920
MMBtu
$16,911
-
$
$17,920
-
$
TOTAL IMPLEMENTED Savings:
$49,787
Cost:
$15,270
$2,175 70,047 $1,118 115 $11,663 1,580 $16,911 - $17,920 - $2,175
70,047
kWh
$1,118
115
kW-months/year
$11,663
1,580
MMBtu
$16,911
-
$
$17,920
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost