Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Mississippi State |
---|---|
Assessment Year | 1998 |
Principal Product | Mufflers |
NAICS | n/a |
SIC | 3714 - Motor Vehicle Parts And Accessories |
Sales | $50,000,000-$100,000,000 |
# of Employees | 500 |
Plant Area (Sq.Ft.) | 278,000 |
Annual Production | 3,500,000 Pieces |
Production Hrs. Annual | 3,920 |
Location (State) | AL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $387,880 | 11,083,822 | kWh | $0.03 |
Electricity Demand | $299 | 63 | kW-months/year | $4.75 |
Electricity Fees | $138,007 | - | $ | - |
Natural Gas | $10,630 | 1,919 | MMBtu | $5.54 |
TOTAL ENERGY COSTS | $225,248 | |||
RECOMMENDED SAVINGS* | $129,392 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $117,151 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Other Liquid (haz) | Personnel Changes | Electricity Usage | Electricity Fees | Natural Gas | Other Liquid (haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $951 Cost: $239 |
$747 | 19,637 | $204 | - | - | - | - | - | - | - |
$747 19,637 kWh |
$204 - $ |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,645 Cost: $8,030 |
$2,642 | 69,754 | $1,003 | - | - | - | - | - | - | - |
$2,642 69,754 kWh |
$1,003 - $ |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $1,060 Cost: $1,206 |
$758 | 21,102 | $302 | - | - | - | - | - | - | - |
$758 21,102 kWh |
$302 - $ |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,365 Cost: $2,376 |
$4,614 | 121,923 | $1,751 | - | - | - | - | - | - | - |
$4,614 121,923 kWh |
$1,751 - $ |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.6124 BURN WASTE OIL FOR HEAT |
Savings: $8,596 Cost: $5,256 |
- | - | - | - | $2,731 | 493 | $5,865 | 3,795 | - | - |
- - kWh |
- - $ |
$2,731 493 MMBtu |
$5,865 3,795 gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY |
Savings: $108,775 Cost: - |
$1,915 | 104,924 | $1,020 | - | - | - | - | - | $105,840 | - |
$1,915 104,924 kWh |
$1,020 - $ |
- - MMBtu |
- - gal |
$105,840 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $129,392 Cost: $17,107 |
$10,676 | 337,340 | $4,280 | - | $2,731 | 493 | $5,865 | 3,795 | $105,840 | - | $10,676 337,340 kWh |
$4,280 - $ |
$2,731 493 MMBtu |
$5,865 3,795 gal |
$105,840 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $117,151 Cost: $3,821 |
$8,034 | 267,586 | $3,277 | - | - | - | - | - | $105,840 | - | $8,034 267,586 kWh |
$3,277 - $ |
- - MMBtu |
- - gal |
$105,840 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Other Liquid (haz) | Personnel Changes | Electricity Usage | Electricity Fees | Natural Gas | Other Liquid (haz) | Personnel Changes |