Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Mississippi State |
---|---|
Assessment Year | 1998 |
Principal Product | Upholstered Chairs |
NAICS | n/a |
SIC | 2522 - Office Furniture, Except Wood |
Sales | $50,000,000-$100,000,000 |
# of Employees | 210 |
Plant Area (Sq.Ft.) | 192,000 |
Annual Production | 400,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | MS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $108,691 | 3,002,345 | kWh | $0.04 |
Electricity Demand | $72,114 | 8,921 | kW-months/year | $8.08 |
Electricity Fees | $3,007 | - | $ | - |
Natural Gas | $39,186 | 7,587 | MMBtu | $5.16 |
TOTAL ENERGY COSTS | $300,189 | |||
RECOMMENDED SAVINGS* | $37,430 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $21,707 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,476 Cost: $54 |
$691 | 20,809 | $785 | 81 | - | - | - | - | - | - |
$691 20,809 kWh |
$785 81 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $12,499 Cost: $3,080 |
$4,127 | (-59,496) | $8,372 | 864 | - | - | - | - | - | - |
$4,127 (-59,496) kWh |
$8,372 864 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $5,872 Cost: $12,115 |
- | - | - | - | $5,872 | 1,136 | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,872 1,136 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $397 Cost: - |
$397 | 12,016 | - | - | - | - | - | - | - | - |
$397 12,016 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $3,224 Cost: $1,080 |
- | - | - | - | - | - | $3,224 | 62,000 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,224 62,000 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $13,962 Cost: $27,800 |
- | - | - | - | - | - | - | - | $13,962 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$13,962 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $37,430 Cost: $44,129 |
$5,215 | (-26,671) | $9,157 | 945 | $5,872 | 1,136 | $3,224 | 62,000 | $13,962 | - | $5,215 (-26,671) kWh |
$9,157 945 kW-months/year |
$5,872 1,136 MMBtu |
$3,224 62,000 lb |
$13,962 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $21,707 Cost: $39,969 |
$1,088 | 32,825 | $785 | 81 | $5,872 | 1,136 | - | - | $13,962 | - | $1,088 32,825 kWh |
$785 81 kW-months/year |
$5,872 1,136 MMBtu |
- - lb |
$13,962 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes |