IAC logo
IAC Assessment: MS0105
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0105
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1998
Principal Product Pants
NAICS n/a
SIC 2325 - Men's and Boys' Separate Trousers and Slacks
Sales $50,000,000-$100,000,000
# of Employees 119
Plant Area (Sq.Ft.) 60,000
Annual Production 5,000,000 Pieces
Production Hrs. Annual 2,500
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $27,089 588,804 kWh $0.05
Electricity Demand $17,064 3,600 kW-months/year $4.74
Electricity Fees $10,063 - $ -
Natural Gas $66,366 11,150 MMBtu $5.95
TOTAL ENERGY COSTS $128,682
RECOMMENDED SAVINGS* $28,292 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,961
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$16,334
Cost:
$5,000
- - - - $16,334 2,754 - - - - - - -
-
kWh
-
-
kW-months/year
$16,334
2,754
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$1,716
Cost:
-
- - - - $1,716 247 - - - - - - -
-
kWh
-
-
kW-months/year
$1,716
247
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.2153 CLOSE OFF UNNEEDED STEAM LINES Savings:
$176
Cost:
-
- - - - $176 30 - - - - - - -
-
kWh
-
-
kW-months/year
$176
30
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,134
Cost:
-
$608 23,154 $526 111 - - - - - - - - $608
23,154
kWh
$526
111
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$2,285
Cost:
-
- - $2,285 - - - - - - - - - -
-
kWh
$2,285
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 3.1162 USE LESS WASTEFUL PACKAGING Savings:
$1,997
Cost:
$34,896
- - - - - - $(-12,000) 24,000 - - $13,997 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$(-12,000)
24,000
lb
-
-
$
$13,997
-
$
07: 4.522 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE Savings:
$4,650
Cost:
$5,000
- - - - - - - - $4,650 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$4,650
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$28,292
Cost:
$44,896
$608 23,154 $2,811 111 $18,226 3,031 $(-12,000) 24,000 $4,650 - $13,997 - $608
23,154
kWh
$2,811
111
kW-months/year
$18,226
3,031
MMBtu
$(-12,000)
24,000
lb
$4,650
-
$
$13,997
-
$
TOTAL IMPLEMENTED Savings:
$9,961
Cost:
$5,000
$608 23,154 $2,811 111 $1,892 277 - - $4,650 - - - $608
23,154
kWh
$2,811
111
kW-months/year
$1,892
277
MMBtu
-
-
lb
$4,650
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost