IAC logo
IAC Assessment: MS0117
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0117
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1998
Principal Product Art Supplies
NAICS n/a
SIC 3952 - Lead Pencils And Art Goods
Sales $10,000,000-$50,000,000
# of Employees 219
Plant Area (Sq.Ft.) 180,000
Annual Production 3,500,000 Pieces
Production Hrs. Annual 3,640
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $130,372 3,607,855 kWh $0.04
Electricity Demand $76,967 9,678 kW-months/year $7.95
Electricity Fees $3,601 - $ -
Natural Gas $23,569 4,462 MMBtu $5.28
TOTAL ENERGY COSTS $308,839
RECOMMENDED SAVINGS* $10,833 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Fees Natural Gas Personnel Changes
$ kWh $ $ $ MMBtu $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,837
Cost:
$2,832
$2,795 82,649 $42 - - - - - $2,795
82,649
kWh
$42
-
$
-
-
MMBtu
-
-
$
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$4,835
Cost:
$19,820
$4,764 140,680 $71 - - - - - $4,764
140,680
kWh
$71
-
$
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,757
Cost:
$2,405
- - - - $1,757 328 - - -
-
kWh
-
-
$
$1,757
328
MMBtu
-
-
$
04: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$1,404
Cost:
$1,944
- - - - - - $1,404 - -
-
kWh
-
-
$
-
-
MMBtu
$1,404
-
$
TOTAL RECOMMENDED Savings:
$10,833
Cost:
$27,001
$7,559 223,329 $113 - $1,757 328 $1,404 - $7,559
223,329
kWh
$113
-
$
$1,757
328
MMBtu
$1,404
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ $ $ MMBtu $ $
Electricity Usage Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Fees Natural Gas Personnel Changes