Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Mississippi State |
---|---|
Assessment Year | 1998 |
Principal Product | Upholstered Furniture |
NAICS | n/a |
SIC | 2512 - Upholstered Household Furniture |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 140,000 |
Annual Production | 50,000 Pieces |
Production Hrs. Annual | 2,000 |
Location (State) | MS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $32,185 | 825,029 | kWh | $0.04 |
Electricity Demand | $38,317 | 4,596 | kW-months/year | $8.34 |
Electricity Fees | $2,714 | - | $ | - |
Natural Gas | $7,292 | 1,384 | MMBtu | $5.27 |
TOTAL ENERGY COSTS | $92,962 | |||
RECOMMENDED SAVINGS* | $13,919 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $13,919 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,152 Cost: $925 |
- | - | - | - | $1,152 | 201 | - | - |
- - kWh |
- - $ |
$1,152 201 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $818 Cost: $390 |
- | - | $818 | - | - | - | - | - |
- - kWh |
$818 - $ |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT |
Savings: $777 Cost: $20 |
- | - | - | - | $777 | 136 | - | - |
- - kWh |
- - $ |
$777 136 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $698 Cost: $469 |
$688 | 20,809 | $10 | - | - | - | - | - |
$688 20,809 kWh |
$10 - $ |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $10,474 Cost: $1,968 |
- | - | - | - | - | - | $10,474 | 756,000 |
- - kWh |
- - $ |
- - MMBtu |
$10,474 756,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $13,919 Cost: $3,772 |
$688 | 20,809 | $828 | - | $1,929 | 337 | $10,474 | 756,000 | $688 20,809 kWh |
$828 - $ |
$1,929 337 MMBtu |
$10,474 756,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $13,919 Cost: $3,772 |
$688 | 20,809 | $828 | - | $1,929 | 337 | $10,474 | 756,000 | $688 20,809 kWh |
$828 - $ |
$1,929 337 MMBtu |
$10,474 756,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) |