IAC logo
IAC Assessment: MS0133
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0133
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1999
Principal Product Automotive stampings, wheel covers and rings
NAICS n/a
SIC 3465 - Automotive Stampings
Sales $10,000,000-$50,000,000
# of Employees 137
Plant Area (Sq.Ft.) 258,243
Annual Production 8,000,000 Pieces
Production Hrs. Annual 2,040
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $429,701 9,262,017 kWh $0.05
Electricity Demand $82,958 29,904 kW-months/year $2.77
Electricity Fees $42,083 - $ -
Natural Gas $220,705 72,536 MMBtu $3.04
TOTAL ENERGY COSTS $(-373,525)
RECOMMENDED SAVINGS* $85,068 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $69,575
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ gal $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$20,085
Cost:
$881
$21,323 486,811 - - $(-1,238) - - - - - - - - - $21,323
486,811
kWh
-
-
kW-months/year
$(-1,238)
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,403
Cost:
$360
$970 22,274 $348 130 $85 - - - - - - - - - $970
22,274
kWh
$348
130
kW-months/year
$85
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$534
Cost:
$236
$567 12,896 - - $(-33) - - - - - - - - - $567
12,896
kWh
-
-
kW-months/year
$(-33)
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
04: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$1,791
Cost:
$5,795
$129 2,931 - - $(-8) - - - $1,670 9,959,921 - - - - $129
2,931
kWh
-
-
kW-months/year
$(-8)
-
$
-
-
MMBtu
$1,670
9,959,921
Tgal
-
-
gal
-
-
$
05: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$12,299
Cost:
$16,435
- - - - - - $4,299 1,200 - - $8,000 10,000 - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,299
1,200
MMBtu
-
-
Tgal
$8,000
10,000
gal
-
-
$
06: 4.1250 Savings:
$48,956
Cost:
$6,286
$67 1,758 - - - - $12,969 4,259 $920 5,486,198 - - $35,000 - $67
1,758
kWh
-
-
kW-months/year
-
-
$
$12,969
4,259
MMBtu
$920
5,486,198
Tgal
-
-
gal
$35,000
-
$
TOTAL RECOMMENDED Savings:
$85,068
Cost:
$29,993
$23,056 526,670 $348 130 $(-1,194) - $17,268 5,459 $2,590 15,446,119 $8,000 10,000 $35,000 - $23,056
526,670
kWh
$348
130
kW-months/year
$(-1,194)
-
$
$17,268
5,459
MMBtu
$2,590
15,446,119
Tgal
$8,000
10,000
gal
$35,000
-
$
TOTAL IMPLEMENTED Savings:
$69,575
Cost:
$7,403
$21,957 501,465 - - $(-1,271) - $12,969 4,259 $920 5,486,198 - - $35,000 - $21,957
501,465
kWh
-
-
kW-months/year
$(-1,271)
-
$
$12,969
4,259
MMBtu
$920
5,486,198
Tgal
-
-
gal
$35,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ gal $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Ancillary Material Cost