IAC logo
IAC Assessment: MS0136
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0136
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1999
Principal Product Manufactured Homes
NAICS n/a
SIC 2451 - Mobile Homes
Sales $10,000,000-$50,000,000
# of Employees 234
Plant Area (Sq.Ft.) 115,185
Annual Production 2,080 Pieces
Production Hrs. Annual 2,600
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $74,165 1,292,497 kWh $0.06
Electricity Demand $14,632 6,178 kW-months/year $2.37
Electricity Fees $10,709 - $ -
Natural Gas $9,205 1,787 MMBtu $5.15
TOTAL ENERGY COSTS $193,081
RECOMMENDED SAVINGS* $289,158 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Increase in Production Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Increase in Production
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ %
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,570
Cost:
$133
$1,268 26,671 $323 123 $(-21) - - - - - - - $1,268
26,671
kWh
$323
123
kW-months/year
$(-21)
-
$
-
-
MMBtu
-
-
$
-
-
%
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$561
Cost:
$334
$622 12,896 - - $(-61) - - - - - - - $622
12,896
kWh
-
-
kW-months/year
$(-61)
-
$
-
-
MMBtu
-
-
$
-
-
%
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,618
Cost:
$1,130
$6,255 136,577 - - $(-637) - - - - - - - $6,255
136,577
kWh
-
-
kW-months/year
$(-637)
-
$
-
-
MMBtu
-
-
$
-
-
%
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,296
Cost:
$3,418
- - - - - - $1,296 252 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,296
252
MMBtu
-
-
$
-
-
%
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$717
Cost:
$472
$709 12,309 - - $8 - - - - - - - $709
12,309
kWh
-
-
kW-months/year
$8
-
$
-
-
MMBtu
-
-
$
-
-
%
06: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$279,396
Cost:
$26,310
- - - - - - - - $10,296 - $269,100 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$10,296
-
$
$269,100
-
%
TOTAL RECOMMENDED Savings:
$289,158
Cost:
$31,797
$8,854 188,453 $323 123 $(-711) - $1,296 252 $10,296 - $269,100 - $8,854
188,453
kWh
$323
123
kW-months/year
$(-711)
-
$
$1,296
252
MMBtu
$10,296
-
$
$269,100
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ %
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Increase in Production Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Increase in Production