IAC logo
IAC Assessment: MS0139
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0139
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1999
Principal Product Acoustic Ceiling Tiles
NAICS n/a
SIC 3296 - Mineral Wool
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 450,000
Annual Production 190,000 Thousand Feet
Production Hrs. Annual 7,728
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $545,468 20,776,378 kWh $0.03
Electricity Demand $184,032 40,896 kW-months/year $4.50
Electricity Fees $80,024 - $ -
Natural Gas $1,923,657 668,353 MMBtu $2.88
TOTAL ENERGY COSTS $2,878,339
RECOMMENDED SAVINGS* $71,835 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $68,182
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (haz) Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (haz) Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $
01: 2.7134 USE PHOTOCELL CONTROLS Savings:
$3,484
Cost:
$490
$694 106,975 $788 175 $2,002 - - - - - - - $694
106,975
kWh
$788
175
kW-months/year
$2,002
-
$
-
-
MMBtu
-
-
lb
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$219
Cost:
$591
$57 8,792 - - $162 - - - - - - - $57
8,792
kWh
-
-
kW-months/year
$162
-
$
-
-
MMBtu
-
-
lb
-
-
$
03: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$61,739
Cost:
$26,241
- - - - - - $61,739 21,724 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$61,739
21,724
MMBtu
-
-
lb
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,224
Cost:
$554
$1,610 247,948 - - $4,614 - - - - - - - $1,610
247,948
kWh
-
-
kW-months/year
$4,614
-
$
-
-
MMBtu
-
-
lb
-
-
$
05: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$169
Cost:
$574
- - - - - - - - $1 76 $168 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1
76
lb
$168
-
$
TOTAL RECOMMENDED Savings:
$71,835
Cost:
$28,450
$2,361 363,715 $788 175 $6,778 - $61,739 21,724 $1 76 $168 - $2,361
363,715
kWh
$788
175
kW-months/year
$6,778
-
$
$61,739
21,724
MMBtu
$1
76
lb
$168
-
$
TOTAL IMPLEMENTED Savings:
$68,182
Cost:
$27,386
$1,667 256,740 - - $4,776 - $61,739 21,724 - - - - $1,667
256,740
kWh
-
-
kW-months/year
$4,776
-
$
$61,739
21,724
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (haz) Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (haz) Ancillary Material Cost