IAC logo
IAC Assessment: MS0140
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0140
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1999
Principal Product Two-stroke engines
NAICS n/a
SIC 3519 - Internal Combustion Engines, Nec
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 68,000
Annual Production 180,000 Pieces
Production Hrs. Annual 3,600
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $136,440 4,193,142 kWh $0.03
Electricity Demand $142,353 14,491 kW-months/year $9.82
Electricity Fees $11,820 - $ -
Natural Gas $23,175 4,689 MMBtu $4.94
TOTAL ENERGY COSTS $304,892
RECOMMENDED SAVINGS* $80,647 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $63,015
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,728
Cost:
$790
$3,673 111,079 - - $55 - - - - - - - $3,673
111,079
kWh
-
-
kW-months/year
$55
-
$
-
-
MMBtu
-
-
gal
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$7,639
Cost:
$7,425
- - - - $7,639 - - - - - - - -
-
kWh
-
-
kW-months/year
$7,639
-
$
-
-
MMBtu
-
-
gal
-
-
$
03: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$4,814
Cost:
$1,440
- - - - - - $4,814 968 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,814
968
MMBtu
-
-
gal
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,213
Cost:
$2,922
- - - - - - $2,213 445 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,213
445
MMBtu
-
-
gal
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$666
Cost:
$389
$275 8,206 $381 36 $10 - - - - - - - $275
8,206
kWh
$381
36
kW-months/year
$10
-
$
-
-
MMBtu
-
-
gal
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$11,408
Cost:
$1,299
$11,240 340,270 - - $168 - - - - - - - $11,240
340,270
kWh
-
-
kW-months/year
$168
-
$
-
-
MMBtu
-
-
gal
-
-
$
07: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$5,179
Cost:
$4,416
- - - - - - $3,459 600 $1,720 5,000 - - -
-
kWh
-
-
kW-months/year
-
-
$
$3,459
600
MMBtu
$1,720
5,000
gal
-
-
$
08: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$45,000
Cost:
$19,688
- - - - - - - - - - $45,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$45,000
-
$
TOTAL RECOMMENDED Savings:
$80,647
Cost:
$38,369
$15,188 459,555 $381 36 $7,872 - $10,486 2,013 $1,720 5,000 $45,000 - $15,188
459,555
kWh
$381
36
kW-months/year
$7,872
-
$
$10,486
2,013
MMBtu
$1,720
5,000
gal
$45,000
-
$
TOTAL IMPLEMENTED Savings:
$63,015
Cost:
$25,088
$15,188 459,555 $381 36 $233 - $2,213 445 - - $45,000 - $15,188
459,555
kWh
$381
36
kW-months/year
$233
-
$
$2,213
445
MMBtu
-
-
gal
$45,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) One-time Revenue or Avoided Cost