IAC logo
IAC Assessment: MS0147
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0147
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1999
Principal Product Steel Brads and Staples
NAICS n/a
SIC 3315 - Steel Wire And Related Products
Sales $10,000,000-$50,000,000
# of Employees 154
Plant Area (Sq.Ft.) 132,000
Annual Production 1,800,000 Pieces
Production Hrs. Annual 6,240
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $274,156 7,801,876 kWh $0.04
Electricity Demand $208,974 19,968 kW-months/year $10.47
Electricity Fees $10,901 - $ -
Natural Gas $22,936 3,354 MMBtu $6.84
TOTAL ENERGY COSTS $533,416
RECOMMENDED SAVINGS* $36,973 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,213
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz)
$ kWh $ kW-months/year $ $ $ MMBtu $ gal
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$15,658
Cost:
$1,110
$15,427 439,039 - - $231 - - - - - $15,427
439,039
kWh
-
-
kW-months/year
$231
-
$
-
-
MMBtu
-
-
gal
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,258
Cost:
$708
$1,239 35,170 - - $19 - - - - - $1,239
35,170
kWh
-
-
kW-months/year
$19
-
$
-
-
MMBtu
-
-
gal
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,733
Cost:
$798
$1,188 33,705 $519 48 $26 - - - - - $1,188
33,705
kWh
$519
48
kW-months/year
$26
-
$
-
-
MMBtu
-
-
gal
04: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT Savings:
$1,128
Cost:
$20
- - - - - - $1,128 171 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,128
171
MMBtu
-
-
gal
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$5,027
Cost:
$1,391
$4,655 155,920 $5,194 480 $148 - $(-4,970) (-753) - - $4,655
155,920
kWh
$5,194
480
kW-months/year
$148
-
$
$(-4,970)
(-753)
MMBtu
-
-
gal
06: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$12,169
Cost:
$24,480
- - - - - - $(-860) (-130) $13,029 11,136 -
-
kWh
-
-
kW-months/year
-
-
$
$(-860)
(-130)
MMBtu
$13,029
11,136
gal
07: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
TOTAL RECOMMENDED Savings:
$36,973
Cost:
$28,507
$22,509 663,834 $5,713 528 $424 - $(-4,702) (-712) $13,029 11,136 $22,509
663,834
kWh
$5,713
528
kW-months/year
$424
-
$
$(-4,702)
(-712)
MMBtu
$13,029
11,136
gal
TOTAL IMPLEMENTED Savings:
$30,213
Cost:
$26,318
$16,666 474,209 - - $250 - $268 41 $13,029 11,136 $16,666
474,209
kWh
-
-
kW-months/year
$250
-
$
$268
41
MMBtu
$13,029
11,136
gal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz)