IAC logo
IAC Assessment: MS0152
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0152
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2000
Principal Product Heat Exchangers
NAICS n/a
SIC 3585 - Refrigeration And Heating Equipment
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 217,000
Annual Production 57,200 Pieces
Production Hrs. Annual 7,440
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $258,243 5,770,223 kWh $0.04
Electricity Demand $41,569 11,833 kW-months/year $3.51
Electricity Fees $(-20,484) - $ -
Natural Gas $60,423 17,310 MMBtu $3.49
TOTAL ENERGY COSTS $288,469
RECOMMENDED SAVINGS* $27,198 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,429
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ gal $ Tgal
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$331
Cost:
$136
$362 10,551 $52 17 $(-83) - - - - - - - - - $362
10,551
kWh
$52
17
kW-months/year
$(-83)
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,518
Cost:
$457
$11,816 343,787 - - $(-3,298) - - - - - - - - - $11,816
343,787
kWh
-
-
kW-months/year
$(-3,298)
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
Tgal
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,651
Cost:
$3,747
- - - - - - $3,651 1,037 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$3,651
1,037
MMBtu
-
-
Tgal
-
-
gal
-
-
Tgal
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,911
Cost:
$2,652
$5,426 157,972 - - $(-1,515) - - - - - - - - - $5,426
157,972
kWh
-
-
kW-months/year
$(-1,515)
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
Tgal
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,407
Cost:
$4,000
- - - - - - $1,407 425 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,407
425
MMBtu
-
-
Tgal
-
-
gal
-
-
Tgal
06: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$432
Cost:
$1,974
- - - - - - $232 56 - - $200 500 - - -
-
kWh
-
-
kW-months/year
-
-
$
$232
56
MMBtu
-
-
Tgal
$200
500
gal
-
-
Tgal
07: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$8,948
Cost:
$4,500
- - - - - - - - $3,029 2,753,200 - - $5,919 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$3,029
2,753,200
Tgal
-
-
gal
$5,919
-
Tgal
TOTAL RECOMMENDED Savings:
$27,198
Cost:
$17,466
$17,604 512,310 $52 17 $(-4,896) - $5,290 1,518 $3,029 2,753,200 $200 500 $5,919 - $17,604
512,310
kWh
$52
17
kW-months/year
$(-4,896)
-
$
$5,290
1,518
MMBtu
$3,029
2,753,200
Tgal
$200
500
gal
$5,919
-
Tgal
TOTAL IMPLEMENTED Savings:
$12,429
Cost:
$3,109
$17,242 501,759 - - $(-4,813) - - - - - - - - - $17,242
501,759
kWh
-
-
kW-months/year
$(-4,813)
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ gal $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Water Consumption