Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Mississippi State |
---|---|
Assessment Year | 2000 |
Principal Product | Roof Trusses |
NAICS | n/a |
SIC | 2452 - Prefabricated Wood Buildings |
Sales | $50,000,000-$100,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 126,031 |
Annual Production | 5,200 Thousand Feet |
Production Hrs. Annual | 2,080 |
Location (State) | MS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $30,585 | 598,769 | kWh | $0.05 |
Electricity Fees | $13,777 | - | $ | - |
Natural Gas | $1,596 | 277 | MMBtu | $5.76 |
TOTAL ENERGY COSTS | $95,567 | |||
RECOMMENDED SAVINGS* | $22,365 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Water Consumption | Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | lb | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,672 Cost: $327 |
$1,128 | 21,688 | $544 | - | - | - | - | - | - | - | - | - |
$1,128 21,688 kWh |
$544 - $ |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $303 Cost: - |
$205 | 3,810 | $98 | - | - | - | - | - | - | - | - | - |
$205 3,810 kWh |
$98 - $ |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT |
Savings: $333 Cost: $54 |
- | - | - | - | $333 | 58 | - | - | - | - | - | - |
- - kWh |
- - $ |
$333 58 MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $722 Cost: $1,008 |
$487 | 9,379 | $235 | - | - | - | - | - | - | - | - | - |
$487 9,379 kWh |
$235 - $ |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $18,776 Cost: $38,510 |
$(-1,128) | (-14,654) | - | - | - | - | $38,710 | 4,776,400 | $(-18,806) | - | - | - |
$(-1,128) (-14,654) kWh |
- - $ |
- - MMBtu |
$38,710 4,776,400 lb |
$(-18,806) - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $559 Cost: $453 |
- | - | - | - | - | - | - | - | - | - | $559 | - |
- - kWh |
- - $ |
- - MMBtu |
- - lb |
- - $ |
$559 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $22,365 Cost: $40,352 |
$692 | 20,223 | $877 | - | $333 | 58 | $38,710 | 4,776,400 | $(-18,806) | - | $559 | - | $692 20,223 kWh |
$877 - $ |
$333 58 MMBtu |
$38,710 4,776,400 lb |
$(-18,806) - $ |
$559 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - $ |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | lb | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Water Consumption | Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Water Consumption |