IAC logo
IAC Assessment: MS0157
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0157
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2000
Principal Product Roof Trusses
NAICS n/a
SIC 2452 - Prefabricated Wood Buildings
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 126,031
Annual Production 5,200 Thousand Feet
Production Hrs. Annual 2,080
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $30,585 598,769 kWh $0.05
Electricity Fees $13,777 - $ -
Natural Gas $1,596 277 MMBtu $5.76
TOTAL ENERGY COSTS $95,567
RECOMMENDED SAVINGS* $22,365 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes Water Consumption Electricity Usage Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes Water Consumption
$ kWh $ $ $ MMBtu $ lb $ $ $ Tgal
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,672
Cost:
$327
$1,128 21,688 $544 - - - - - - - - - $1,128
21,688
kWh
$544
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
Tgal
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$303
Cost:
-
$205 3,810 $98 - - - - - - - - - $205
3,810
kWh
$98
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
Tgal
03: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT Savings:
$333
Cost:
$54
- - - - $333 58 - - - - - - -
-
kWh
-
-
$
$333
58
MMBtu
-
-
lb
-
-
$
-
-
Tgal
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$722
Cost:
$1,008
$487 9,379 $235 - - - - - - - - - $487
9,379
kWh
$235
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
Tgal
05: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$18,776
Cost:
$38,510
$(-1,128) (-14,654) - - - - $38,710 4,776,400 $(-18,806) - - - $(-1,128)
(-14,654)
kWh
-
-
$
-
-
MMBtu
$38,710
4,776,400
lb
$(-18,806)
-
$
-
-
Tgal
06: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$559
Cost:
$453
- - - - - - - - - - $559 - -
-
kWh
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
$559
-
Tgal
TOTAL RECOMMENDED Savings:
$22,365
Cost:
$40,352
$692 20,223 $877 - $333 58 $38,710 4,776,400 $(-18,806) - $559 - $692
20,223
kWh
$877
-
$
$333
58
MMBtu
$38,710
4,776,400
lb
$(-18,806)
-
$
$559
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ $ $ MMBtu $ lb $ $ $ Tgal
Electricity Usage Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes Water Consumption Electricity Usage Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes Water Consumption