IAC logo
IAC Assessment: MS0159
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0159
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2000
Principal Product Upholstered Wood Furniture
NAICS n/a
SIC 2512 - Upholstered Household Furniture
Sales $10,000,000-$50,000,000
# of Employees 430
Plant Area (Sq.Ft.) 300,000
Annual Production 182,000 Pieces
Production Hrs. Annual 2,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $46,725 1,162,661 kWh $0.04
Electricity Demand $28,951 3,933 kW-months/year $7.36
Electricity Fees $1,328 - $ -
Natural Gas $16,835 2,568 MMBtu $6.56
TOTAL ENERGY COSTS $109,212
RECOMMENDED SAVINGS* $16,180 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,369
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ $ $ lb $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,370
Cost:
$4,200
$2,335 71,805 - - $35 - - - - - $2,335
71,805
kWh
-
-
kW-months/year
$35
-
$
-
-
lb
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$9,318
Cost:
$276
$3,258 99,941 $5,922 600 $138 - - - - - $3,258
99,941
kWh
$5,922
600
kW-months/year
$138
-
$
-
-
lb
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,051
Cost:
$841
$907 29,601 - - $144 - - - - - $907
29,601
kWh
-
-
kW-months/year
$144
-
$
-
-
lb
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$3,441
Cost:
$6,500
- - - - - - $741 270,000 $2,700 - -
-
kWh
-
-
kW-months/year
-
-
$
$741
270,000
lb
$2,700
-
$
TOTAL RECOMMENDED Savings:
$16,180
Cost:
$11,817
$6,500 201,347 $5,922 600 $317 - $741 270,000 $2,700 - $6,500
201,347
kWh
$5,922
600
kW-months/year
$317
-
$
$741
270,000
lb
$2,700
-
$
TOTAL IMPLEMENTED Savings:
$10,369
Cost:
$1,117
$4,165 129,542 $5,922 600 $282 - - - - - $4,165
129,542
kWh
$5,922
600
kW-months/year
$282
-
$
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Administrative Changes