IAC Assessment: MS0174
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0174
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2000
Principal Product plastic spools
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 53
Plant Area (Sq.Ft.) 40,000
Annual Production 2,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $83,971 2,345,400 kWh $0.04
Electricity Demand $35,326 4,762 kW-months/year $7.42
Electricity Fees $9,216 - $ -
Natural Gas $5,397 763 MMBtu $7.07
TOTAL ENERGY COSTS $138,429
RECOMMENDED SAVINGS* $35,634 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$7,319
Cost:
$6,300
- - - - $7,319 - - - - - -
-
kWh
-
-
kW-months/year
$7,319
-
$
-
-
MMBtu
-
-
lb
02: 2.7134 USE PHOTOCELL CONTROLS Savings:
$243
Cost:
$148
$240 7,237 - - $3 - - - - - $240
7,237
kWh
-
-
kW-months/year
$3
-
$
-
-
MMBtu
-
-
lb
03: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT Savings:
$159
Cost:
$60
- - - - - - $159 23 - - -
-
kWh
-
-
kW-months/year
-
-
$
$159
23
MMBtu
-
-
lb
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,584
Cost:
$3,339
- - - - - - $2,584 366 - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,584
366
MMBtu
-
-
lb
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$24,750
Cost:
$68,250
$18,712 564,635 $5,672 555 $366 - - - - - $18,712
564,635
kWh
$5,672
555
kW-months/year
$366
-
$
-
-
MMBtu
-
-
lb
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$368
Cost:
$156
$363 10,950 - - $5 - - - - - $363
10,950
kWh
-
-
kW-months/year
$5
-
$
-
-
MMBtu
-
-
lb
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$211
Cost:
-
- - - - - - - - $211 8,100 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$211
8,100
lb
TOTAL RECOMMENDED Savings:
$35,634
Cost:
$78,253
$19,315 582,822 $5,672 555 $7,693 - $2,743 389 $211 8,100 $19,315
582,822
kWh
$5,672
555
kW-months/year
$7,693
-
$
$2,743
389
MMBtu
$211
8,100
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)