Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Mississippi State |
---|---|
Assessment Year | 2001 |
Principal Product | Industrial Floor Matting |
NAICS | n/a |
SIC | 2821 - Plastics Materials And Resins |
Sales | $10,000,000-$50,000,000 |
# of Employees | 75 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 8,900 Thousand Feet |
Production Hrs. Annual | 7,488 |
Location (State) | MS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $112,662 | 2,515,400 | kWh | $0.04 |
Electricity Demand | $71,462 | 11,766 | kW-months/year | $6.07 |
Electricity Fees | $3,005 | - | $ | - |
TOTAL ENERGY COSTS | $200,419 | |||
RECOMMENDED SAVINGS* | $28,474 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $21,693 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $20,073 Cost: $3,000 |
- | - | $19,776 | 3,090 | $297 | - | - | - | - | - | - | - | - | - |
- - kWh |
$19,776 3,090 kW-months/year |
$297 - $ |
- - MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,805 Cost: $3,789 |
$2,763 | 64,259 | - | - | $42 | - | - | - | - | - | - | - | - | - |
$2,763 64,259 kWh |
- - kW-months/year |
$42 - $ |
- - MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,391 Cost: $136 |
$1,371 | 31,881 | - | - | $20 | - | - | - | - | - | - | - | - | - |
$1,371 31,881 kWh |
- - kW-months/year |
$20 - $ |
- - MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $454 Cost: $236 |
$447 | 10,392 | - | - | $7 | - | - | - | - | - | - | - | - | - |
$447 10,392 kWh |
- - kW-months/year |
$7 - $ |
- - MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT |
Savings: $229 Cost: $88 |
- | - | - | - | - | - | $229 | 40 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$229 40 MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $177 Cost: $195 |
$139 | 3,243 | $35 | 6 | $3 | - | - | - | - | - | - | - | - | - |
$139 3,243 kWh |
$35 6 kW-months/year |
$3 - $ |
- - MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6124 BURN WASTE OIL FOR HEAT |
Savings: $1,676 Cost: $2,374 |
- | - | - | - | - | - | $626 | 93 | $1,050 | 830 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$626 93 MMBtu |
$1,050 830 gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.7196 USE RE-USABLE FILTERS |
Savings: $91 Cost: $133 |
- | - | - | - | - | - | - | - | - | - | $1 | 18 | $90 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - gal |
$1 18 lb |
$90 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $1,578 Cost: $869 |
- | - | - | - | - | - | - | - | - | - | - | - | $1,578 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - gal |
- - lb |
$1,578 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $28,474 Cost: $10,820 |
$4,720 | 109,775 | $19,811 | 3,096 | $369 | - | $855 | 133 | $1,050 | 830 | $1 | 18 | $1,668 | - | $4,720 109,775 kWh |
$19,811 3,096 kW-months/year |
$369 - $ |
$855 133 MMBtu |
$1,050 830 gal |
$1 18 lb |
$1,668 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $21,693 Cost: $3,224 |
$1,371 | 31,881 | $19,776 | 3,090 | $317 | - | $229 | 40 | - | - | - | - | - | - | $1,371 31,881 kWh |
$19,776 3,090 kW-months/year |
$317 - $ |
$229 40 MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Ancillary Material Cost |