IAC logo
IAC Assessment: MS0182
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0182
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2001
Principal Product Upholstered Furniture
NAICS n/a
SIC 2512 - Upholstered Household Furniture
Sales $5,000,000-$10,000,000
# of Employees 110
Plant Area (Sq.Ft.) 90,000
Annual Production 85,000 Pieces
Production Hrs. Annual 2,250
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $38,268 896,080 kWh $0.04
Electricity Demand $23,341 4,200 kW-months/year $5.56
Electricity Fees $3,367 - $ -
Natural Gas $23,490 2,534 MMBtu $9.27
TOTAL ENERGY COSTS $96,042
RECOMMENDED SAVINGS* $4,287 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,939
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,138
Cost:
$2,205
- - - - $2,138 - - - -
-
kWh
-
-
kW-months/year
$2,138
-
$
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,201
Cost:
$427
$1,183 35,600 - - $18 - - - $1,183
35,600
kWh
-
-
kW-months/year
$18
-
$
-
-
MMBtu
03: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT Savings:
$647
Cost:
$54
- - - - - - $647 70 -
-
kWh
-
-
kW-months/year
-
-
$
$647
70
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$210
Cost:
$195
$81 2,441 $126 15 $3 - - - $81
2,441
kWh
$126
15
kW-months/year
$3
-
$
-
-
MMBtu
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$91
Cost:
-
$90 2,700 - - $1 - - - $90
2,700
kWh
-
-
kW-months/year
$1
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$4,287
Cost:
$2,881
$1,354 40,741 $126 15 $2,160 - $647 70 $1,354
40,741
kWh
$126
15
kW-months/year
$2,160
-
$
$647
70
MMBtu
TOTAL IMPLEMENTED Savings:
$1,939
Cost:
$481
$1,273 38,300 - - $19 - $647 70 $1,273
38,300
kWh
-
-
kW-months/year
$19
-
$
$647
70
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas