IAC logo
IAC Assessment: MS0199
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0199
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2002
Principal Product Fabricated steel structures
NAICS n/a
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 167
Plant Area (Sq.Ft.) 70,000
Annual Production 12,000 Tons
Production Hrs. Annual 5,993
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $128,255 2,618,992 kWh $0.05
Electricity Demand $20,956 7,635 kW-months/year $2.74
Electricity Fees $24,085 - $ -
Natural Gas $76,122 7,778 MMBtu $9.79
TOTAL ENERGY COSTS $259,657
RECOMMENDED SAVINGS* $518,210 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,385
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$7,110
Cost:
$3,070
- - - - - - $7,110 726 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$7,110
726
MMBtu
-
-
gal
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,645
Cost:
$437
$6,319 132,474 - - $2,326 - - - - - - - $6,319
132,474
kWh
-
-
kW-months/year
$2,326
-
$
-
-
MMBtu
-
-
gal
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$740
Cost:
$827
$541 11,430 - - $199 - - - - - - - $541
11,430
kWh
-
-
kW-months/year
$199
-
$
-
-
MMBtu
-
-
gal
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$534
Cost:
$242
$357 7,620 $44 18 $133 - - - - - - - $357
7,620
kWh
$44
18
kW-months/year
$133
-
$
-
-
MMBtu
-
-
gal
-
-
$
05: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$1,181
Cost:
$409
- - - - - - $851 74 $330 660 - - -
-
kWh
-
-
kW-months/year
-
-
$
$851
74
MMBtu
$330
660
gal
-
-
$
06: 4.511 EXPAND OPERATIONS INTO UNUSED SPACE Savings:
$500,000
Cost:
$1,000,000
- - - - - - - - - - $500,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$500,000
-
$
TOTAL RECOMMENDED Savings:
$518,210
Cost:
$1,004,985
$7,217 151,524 $44 18 $2,658 - $7,961 800 $330 660 $500,000 - $7,217
151,524
kWh
$44
18
kW-months/year
$2,658
-
$
$7,961
800
MMBtu
$330
660
gal
$500,000
-
$
TOTAL IMPLEMENTED Savings:
$9,385
Cost:
$1,264
$6,860 143,904 - - $2,525 - - - - - - - $6,860
143,904
kWh
-
-
kW-months/year
$2,525
-
$
-
-
MMBtu
-
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Primary Product