IAC logo
IAC Assessment: MS0204
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0204
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2002
Principal Product Aluminum foil
NAICS n/a
SIC 3353 - Aluminum Sheet, Plate, And Foil
Sales $50,000,000-$100,000,000
# of Employees 138
Plant Area (Sq.Ft.) 181,000
Annual Production 45,839,000 Pounds
Production Hrs. Annual 8,736
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $134,758 16,298,650 kWh $0.01
Electricity Demand $293,477 33,327 kW-months/year $8.81
Electricity Fees $352,370 - $ -
Natural Gas $513,534 93,061 MMBtu $5.52
TOTAL ENERGY COSTS $1,404,389
RECOMMENDED SAVINGS* $126,634 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $218
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$97,931
Cost:
$34,200
- - - - - - $97,931 17,741 - - -
-
kWh
-
-
kW-months/year
-
-
$
$97,931
17,741
MMBtu
-
-
$
02: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$10,266
Cost:
$5,760
- - - - - - $10,266 1,860 - - -
-
kWh
-
-
kW-months/year
-
-
$
$10,266
1,860
MMBtu
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$7,500
Cost:
$3,763
- - - - - - $7,500 1,359 - - -
-
kWh
-
-
kW-months/year
-
-
$
$7,500
1,359
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,399
Cost:
$331
$1,645 195,487 - - $3,754 - - - - - $1,645
195,487
kWh
-
-
kW-months/year
$3,754
-
$
-
-
MMBtu
-
-
$
05: 2.7292 LOWER CEILING TO REDUCE CONDITIONED SPACE Savings:
$3,771
Cost:
$1,000
$667 79,132 $810 170 $1,812 - $482 87 - - $667
79,132
kWh
$810
170
kW-months/year
$1,812
-
$
$482
87
MMBtu
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,549
Cost:
$2,030
$472 55,979 - - $1,077 - - - - - $472
55,979
kWh
-
-
kW-months/year
$1,077
-
$
-
-
MMBtu
-
-
$
07: 2.7122 DISCONNECT BALLASTS Savings:
$129
Cost:
$256
$30 3,517 $23 5 $76 - - - - - $30
3,517
kWh
$23
5
kW-months/year
$76
-
$
-
-
MMBtu
-
-
$
08: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$89
Cost:
$25
- - - - - - - - $89 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$89
-
$
TOTAL RECOMMENDED Savings:
$126,634
Cost:
$47,365
$2,814 334,115 $833 175 $6,719 - $116,179 21,047 $89 - $2,814
334,115
kWh
$833
175
kW-months/year
$6,719
-
$
$116,179
21,047
MMBtu
$89
-
$
TOTAL IMPLEMENTED Savings:
$218
Cost:
$281
$30 3,517 $23 5 $76 - - - $89 - $30
3,517
kWh
$23
5
kW-months/year
$76
-
$
-
-
MMBtu
$89
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost