IAC logo
IAC Assessment: MS0209
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0209
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2002
Principal Product Specialized fabricated machinery
NAICS n/a
SIC 3549 - Metalworking Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 87
Plant Area (Sq.Ft.) 86,000
Annual Production 21,600 Pieces
Production Hrs. Annual 6,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $30,625 1,941,360 kWh $0.02
Electricity Demand $35,978 7,094 kW-months/year $5.07
Electricity Fees $51,243 - $ -
Natural Gas $25,544 2,313 MMBtu $11.04
TOTAL ENERGY COSTS $150,284
RECOMMENDED SAVINGS* $9,228 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,665
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$4,200
Cost:
$75
- - - - - - - - - - $4,200 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
$4,200
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,434
Cost:
$280
$128 13,580 $962 163 $344 - - - - - - - $128
13,580
kWh
$962
163
kW-months/year
$344
-
$
-
-
MMBtu
-
-
lb
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$822
Cost:
$591
$230 24,344 - - $592 - - - - - - - $230
24,344
kWh
-
-
kW-months/year
$592
-
$
-
-
MMBtu
-
-
lb
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$191
Cost:
$158
$53 5,659 - - $138 - - - - - - - $53
5,659
kWh
-
-
kW-months/year
$138
-
$
-
-
MMBtu
-
-
lb
-
-
$
05: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$1,741
Cost:
$2,012
- - - - - - $1,741 134 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,741
134
MMBtu
-
-
lb
-
-
$
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$840
Cost:
-
- - - - - - - - $840 48,000 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$840
48,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$9,228
Cost:
$3,116
$411 43,583 $962 163 $1,074 - $1,741 134 $840 48,000 $4,200 - $411
43,583
kWh
$962
163
kW-months/year
$1,074
-
$
$1,741
134
MMBtu
$840
48,000
lb
$4,200
-
$
TOTAL IMPLEMENTED Savings:
$6,665
Cost:
$513
$181 19,239 $962 163 $482 - - - $840 48,000 $4,200 - $181
19,239
kWh
$962
163
kW-months/year
$482
-
$
-
-
MMBtu
$840
48,000
lb
$4,200
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes