IAC logo
IAC Assessment: MS0211
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0211
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2002
Principal Product Upholstered furniture
NAICS n/a
SIC 2521 - Wood Office Furniture
Sales $10,000,000-$50,000,000
# of Employees 162
Plant Area (Sq.Ft.) 189,671
Annual Production 182,500 Pieces
Production Hrs. Annual 2,025
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $36,335 908,000 kWh $0.04
Electricity Demand $62,996 6,764 kW-months/year $9.31
Electricity Fees $5,493 - $ -
Natural Gas $24,860 3,685 MMBtu $6.75
TOTAL ENERGY COSTS $147,975
RECOMMENDED SAVINGS* $54,407 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,633
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,096
Cost:
$1,739
- - - - - - $2,096 311 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,096
311
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,516
Cost:
$577
$1,494 45,061 - - $22 - - - - - - - - - $1,494
45,061
kWh
-
-
kW-months/year
$22
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$864
Cost:
$2,540
- - - - - - $864 128 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$864
128
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$675
Cost:
$472
$665 20,063 - - $10 - - - - - - - - - $665
20,063
kWh
-
-
kW-months/year
$10
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.7122 DISCONNECT BALLASTS Savings:
$442
Cost:
$255
$154 4,650 $281 28 $7 - - - - - - - - - $154
4,650
kWh
$281
28
kW-months/year
$7
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 4.1320 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$48,814
Cost:
$175,000
- - - - - - - - $9,471 118,387 $5,490 - $33,853 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$9,471
118,387
lb
$5,490
-
$
$33,853
-
$
TOTAL RECOMMENDED Savings:
$54,407
Cost:
$180,583
$2,313 69,774 $281 28 $39 - $2,960 439 $9,471 118,387 $5,490 - $33,853 - $2,313
69,774
kWh
$281
28
kW-months/year
$39
-
$
$2,960
439
MMBtu
$9,471
118,387
lb
$5,490
-
$
$33,853
-
$
TOTAL IMPLEMENTED Savings:
$2,633
Cost:
$1,304
$2,313 69,774 $281 28 $39 - - - - - - - - - $2,313
69,774
kWh
$281
28
kW-months/year
$39
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost