IAC logo
IAC Assessment: MS0219
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0219
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2002
Principal Product Mineral fiber products and acoustical tile
NAICS n/a
SIC 3296 - Mineral Wool
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 958,323
Annual Production 445,850 Thousand Feet
Production Hrs. Annual 6,240
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,423,056 70,519,680 kWh $0.03
Electricity Fees $685,501 - $ -
Natural Gas $5,126,109 1,891,553 MMBtu $2.71
TOTAL ENERGY COSTS $8,234,666
RECOMMENDED SAVINGS* $1,136,306 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $119,155
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
01: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$529,152
Cost:
$198,480
- - - - - - $529,152 195,259 - - -
-
kWh
-
-
kW-months/year
-
-
$
$529,152
195,259
MMBtu
-
-
lb
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$425,529
Cost:
$1,452,000
$546,736 15,912,000 $130,257 22,828 $115,069 - $(-366,533) (-125,252) - - $546,736
15,912,000
kWh
$130,257
22,828
kW-months/year
$115,069
-
$
$(-366,533)
(-125,252)
MMBtu
-
-
lb
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$67,886
Cost:
$1,950
$65,936 1,918,965 - - $1,950 - - - - - $65,936
1,918,965
kWh
-
-
kW-months/year
$1,950
-
$
-
-
MMBtu
-
-
lb
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$44,270
Cost:
$30,411
$28,773 837,400 $9,175 1,608 $6,322 - - - - - $28,773
837,400
kWh
$9,175
1,608
kW-months/year
$6,322
-
$
-
-
MMBtu
-
-
lb
05: 2.7311 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE Savings:
$23,617
Cost:
$1,500
$19,961 580,949 - - $3,656 - - - - - $19,961
580,949
kWh
-
-
kW-months/year
$3,656
-
$
-
-
MMBtu
-
-
lb
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$20,902
Cost:
$97
$14,549 423,423 $3,309 580 $3,044 - - - - - $14,549
423,423
kWh
$3,309
580
kW-months/year
$3,044
-
$
-
-
MMBtu
-
-
lb
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,779
Cost:
$1,113
$3,194 92,951 - - $585 - - - - - $3,194
92,951
kWh
-
-
kW-months/year
$585
-
$
-
-
MMBtu
-
-
lb
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,971
Cost:
$696
$2,511 73,089 - - $460 - - - - - $2,511
73,089
kWh
-
-
kW-months/year
$460
-
$
-
-
MMBtu
-
-
lb
09: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$18,200
Cost:
-
- - - - - - - - $18,200 104,000 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$18,200
104,000
lb
TOTAL RECOMMENDED Savings:
$1,136,306
Cost:
$1,686,247
$681,660 19,838,777 $142,741 25,016 $131,086 - $162,619 70,007 $18,200 104,000 $681,660
19,838,777
kWh
$142,741
25,016
kW-months/year
$131,086
-
$
$162,619
70,007
MMBtu
$18,200
104,000
lb
TOTAL IMPLEMENTED Savings:
$119,155
Cost:
$5,356
$106,151 3,089,377 $3,309 580 $9,695 - - - - - $106,151
3,089,377
kWh
$3,309
580
kW-months/year
$9,695
-
$
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)