IAC logo
IAC Assessment: MS0221
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0221
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2003
Principal Product Heat Exchangers
NAICS 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585 - Refrigeration And Heating Equipment
Sales $100,000,000-$500,000,000
# of Employees 1,293
Plant Area (Sq.Ft.) 800,000
Annual Production 3,000,000 Pieces
Production Hrs. Annual 6,600
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $985,795 28,690,200 kWh $0.03
Electricity Demand $451,127 76,961 kW-months/year $5.86
Electricity Fees $205,395 - $ -
Natural Gas $788,050 148,694 MMBtu $5.30
TOTAL ENERGY COSTS $2,433,482
RECOMMENDED SAVINGS* $224,316 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $211,784
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Administrative Changes Electricity Usage Electricity Demand Electricity Fees Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$202,950
Cost:
$8,100
- - - - - - $202,950 - -
-
kWh
-
-
kW-months/year
-
-
$
$202,950
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,072
Cost:
$12,006
$10,203 296,953 - - $1,869 - - - $10,203
296,953
kWh
-
-
kW-months/year
$1,869
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,834
Cost:
$782
$7,466 217,290 - - $1,368 - - - $7,466
217,290
kWh
-
-
kW-months/year
$1,368
-
$
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$460
Cost:
$585
$302 8,777 $91 16 $67 - - - $302
8,777
kWh
$91
16
kW-months/year
$67
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$224,316
Cost:
$21,473
$17,971 523,020 $91 16 $3,304 - $202,950 - $17,971
523,020
kWh
$91
16
kW-months/year
$3,304
-
$
$202,950
-
$
TOTAL IMPLEMENTED Savings:
$211,784
Cost:
$8,882
$7,466 217,290 - - $1,368 - $202,950 - $7,466
217,290
kWh
-
-
kW-months/year
$1,368
-
$
$202,950
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Administrative Changes Electricity Usage Electricity Demand Electricity Fees Administrative Changes