IAC logo
IAC Assessment: MS0225
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0225
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2003
Principal Product Galvanized and galvalume steel
NAICS 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479 - Metal Coating And Allied Services
Sales $100,000,000-$500,000,000
# of Employees 81
Plant Area (Sq.Ft.) 220,000
Annual Production 600,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,113,395 32,329,504 kWh $0.03
Electricity Demand $358,701 60,825 kW-months/year $5.90
Electricity Fees $194,340 - $ -
Natural Gas $1,201,377 306,600 MMBtu $3.92
TOTAL ENERGY COSTS $2,144,058
RECOMMENDED SAVINGS* $13,821 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,054
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,764
Cost:
$670
$5,252 152,221 - - $512 - $5,252
152,221
kWh
-
-
kW-months/year
$512
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,290
Cost:
$4,667
$3,908 113,289 - - $382 - $3,908
113,289
kWh
-
-
kW-months/year
$382
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,074
Cost:
$1,368
$1,346 39,012 $522 93 $206 - $1,346
39,012
kWh
$522
93
kW-months/year
$206
-
$
04: 2.7291 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS Savings:
$1,449
Cost:
$400
$310 8,986 $971 173 $168 - $310
8,986
kWh
$971
173
kW-months/year
$168
-
$
05: 2.7134 USE PHOTOCELL CONTROLS Savings:
$244
Cost:
$296
$223 6,453 - - $21 - $223
6,453
kWh
-
-
kW-months/year
$21
-
$
TOTAL RECOMMENDED Savings:
$13,821
Cost:
$7,401
$11,039 319,961 $1,493 266 $1,289 - $11,039
319,961
kWh
$1,493
266
kW-months/year
$1,289
-
$
TOTAL IMPLEMENTED Savings:
$10,054
Cost:
$5,337
$9,160 265,510 - - $894 - $9,160
265,510
kWh
-
-
kW-months/year
$894
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees