IAC Assessment: MS0260
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0260
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2004
Principal Product Automotive Pistons
NAICS 336310 - Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3592 - Carburetors, Pistons, Rings, Valves
Sales $1,000,000-$5,000,000
# of Employees 23
Plant Area (Sq.Ft.) 57,600
Annual Production 250,000 Pieces
Production Hrs. Annual 2,600
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,236 851,490 kWh $0.04
Electricity Demand $28,332 3,343 kW-months/year $8.48
Electricity Fees $958 - $ -
Natural Gas $121,344 15,430 MMBtu $7.86
TOTAL ENERGY COSTS $193,070
RECOMMENDED SAVINGS* $55,660 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,152
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Consumption By-product Production Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Consumption By-product Production
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $
01: 4.5210 CLEAR AND RENT EXISTING SPACE Savings:
$28,604
Cost:
$10,000
$412 11,727 $577 54 $15 - - - - - $27,600 - $412
11,727
kWh
$577
54
kW-months/year
$15
-
$
-
-
MMBtu
-
-
Tgal
$27,600
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$12,850
Cost:
$1,350
- - - - - - $12,850 1,634 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$12,850
1,634
MMBtu
-
-
Tgal
-
-
$
03: 3.4151 MINIMIZE WATER USAGE Savings:
$9,057
Cost:
$107
$(-33) (-950) $(-43) (-4) $(-2) - - - $9,135 - - - $(-33)
(-950)
kWh
$(-43)
(-4)
kW-months/year
$(-2)
-
$
-
-
MMBtu
$9,135
-
Tgal
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,685
Cost:
$1,666
- - - - - - $3,685 468 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$3,685
468
MMBtu
-
-
Tgal
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$811
Cost:
$348
$800 22,738 - - $11 - - - - - - - $800
22,738
kWh
-
-
kW-months/year
$11
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.7122 DISCONNECT BALLASTS Savings:
$341
Cost:
$408
$301 8,556 $35 3 $5 - - - - - - - $301
8,556
kWh
$35
3
kW-months/year
$5
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.2514 COVER OPEN TANKS Savings:
$312
Cost:
$68
- - - - - - $312 40 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$312
40
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$55,660
Cost:
$13,947
$1,480 42,071 $569 53 $29 - $16,847 2,142 $9,135 - $27,600 - $1,480
42,071
kWh
$569
53
kW-months/year
$29
-
$
$16,847
2,142
MMBtu
$9,135
-
Tgal
$27,600
-
$
TOTAL IMPLEMENTED Savings:
$1,152
Cost:
$756
$1,101 31,294 $35 3 $16 - - - - - - - $1,101
31,294
kWh
$35
3
kW-months/year
$16
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Consumption By-product Production Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Consumption By-product Production