Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Mississippi State |
---|---|
Assessment Year | 2005 |
Principal Product | Yeast |
NAICS | 311999 - All Other Miscellaneous Food Manufacturing |
SIC | 2099 - Food Preparations, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 53 |
Plant Area (Sq.Ft.) | 65,000 |
Annual Production | 120,000,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $823,054 | 25,179,750 | kWh | $0.03 |
Electricity Demand | $410,403 | 42,799 | kW-months/year | $9.59 |
Electricity Fees | $43,034 | - | $ | - |
Natural Gas | $676,073 | 83,336 | MMBtu | $8.11 |
TOTAL ENERGY COSTS | $1,952,564 | |||
RECOMMENDED SAVINGS* | $167,705 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $8,565 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $147,024 Cost: $1,342,000 |
$446,237 | 11,758,558 | $189,061 | 16,104 | $(-81,563) | - | $(-406,711) | (-50,150) |
$446,237 11,758,558 kWh |
$189,061 16,104 kW-months/year |
$(-81,563) - $ |
$(-406,711) (-50,150) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $11,445 Cost: $575 |
$8,527 | 224,679 | - | - | $(-1,104) | - | $4,022 | 496 |
$8,527 224,679 kWh |
- - kW-months/year |
$(-1,104) - $ |
$4,022 496 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $6,503 Cost: $138 |
$7,471 | 196,843 | - | - | $(-968) | - | - | - |
$7,471 196,843 kWh |
- - kW-months/year |
$(-968) - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,062 Cost: $151 |
$2,368 | 62,394 | - | - | $(-306) | - | - | - |
$2,368 62,394 kWh |
- - kW-months/year |
$(-306) - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS |
Savings: $671 Cost: $972 |
$770 | 20,296 | - | - | $(-99) | - | - | - |
$770 20,296 kWh |
- - kW-months/year |
$(-99) - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $167,705 Cost: $1,343,836 |
$465,373 | 12,262,770 | $189,061 | 16,104 | $(-84,040) | - | $(-402,689) | (-49,654) | $465,373 12,262,770 kWh |
$189,061 16,104 kW-months/year |
$(-84,040) - $ |
$(-402,689) (-49,654) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $8,565 Cost: $289 |
$9,839 | 259,237 | - | - | $(-1,274) | - | - | - | $9,839 259,237 kWh |
- - kW-months/year |
$(-1,274) - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas |