IAC logo
IAC Assessment: MS0404
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0404
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2022
Principal Product Steel tubing
NAICS 331210 - Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317 - Steel Pipe And Tubes
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 350,000
Annual Production 18,500,000 Pounds
Production Hrs. Annual 5,400
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $728,307 9,577,800 kWh $0.08
Electricity Demand $299,493 22,786 kW-months/year $13.14
Electricity Fees $(-126,868) - $ -
Natural Gas $901,571 148,072 MMBtu $6.09
TOTAL ENERGY COSTS $1,802,503
RECOMMENDED SAVINGS* $202,018 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$176,387
Cost:
$1,148,430
$847,835 9,098,910 - - $(-342,446) - $(-329,002) (-53,934) $847,835
9,098,910
kWh
-
-
kW-months/year
$(-342,446)
-
$
$(-329,002)
(-53,934)
MMBtu
02: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$9,805
Cost:
$22,420
- - - - - - $9,805 1,610 -
-
kWh
-
-
kW-months/year
-
-
$
$9,805
1,610
MMBtu
03: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$853
Cost:
$525
$761 10,009 $93 7 - - - - $761
10,009
kWh
$93
7
kW-months/year
-
-
$
-
-
MMBtu
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$14,973
Cost:
$3,790
- - $14,973 1,139 - - - - -
-
kWh
$14,973
1,139
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$202,018
Cost:
$1,175,165
$848,596 9,108,919 $15,066 1,147 $(-342,446) - $(-319,197) (-52,324) $848,596
9,108,919
kWh
$15,066
1,147
kW-months/year
$(-342,446)
-
$
$(-319,197)
(-52,324)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas