IAC logo
IAC Assessment: MS0425
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0425
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2024
Principal Product Dock Levelers and Trailer Restraints
NAICS 333924 - Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing
SIC 3537 - Industrial Trucks And Tractors
Sales $100,000,000-$500,000,000
# of Employees 339
Plant Area (Sq.Ft.) 425,000
Annual Production 43,000 Units
Production Hrs. Annual 6,100
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $255,927 4,450,200 kWh $0.06
Electricity Demand $45,497 10,404 kW-months/year $4.37
Electricity Fees $198,059 - $ -
Natural Gas $61,742 10,803 MMBtu $5.72
LPG $7,986 279 MMBtu $28.62
TOTAL ENERGY COSTS $569,212
RECOMMENDED SAVINGS* $100,915 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG
$ kWh $ kW-months/year $ MMBtu
01: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$6,979
Cost:
$25,000
$(-1,007) (-17,520) - - $7,986 279 $(-1,007)
(-17,520)
kWh
-
-
kW-months/year
$7,986
279
MMBtu
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$20,601
Cost:
$8,975
$20,601 358,276 - - - - $20,601
358,276
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,008
Cost:
$1,523
$4,008 70,136 - - - - $4,008
70,136
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,356
Cost:
-
$3,356 57,867 - - - - $3,356
57,867
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$1,396
Cost:
$255
$1,396 24,506 - - - - $1,396
24,506
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$64,575
Cost:
$710,500
$57,284 996,079 $7,291 1,669 - - $57,284
996,079
kWh
$7,291
1,669
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$100,915
Cost:
$746,253
$85,637 1,489,344 $7,291 1,669 $7,986 279 $85,637
1,489,344
kWh
$7,291
1,669
kW-months/year
$7,986
279
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG