IAC logo
IAC Assessment: MS0445
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0445
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2025
Principal Product Dump Bodies
NAICS 336120 - Heavy Duty Truck Manufacturing
SIC 3711 - Motor Vehicles And Car Bodies
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 200,000
Annual Production 1,800 Units
Production Hrs. Annual 4,500
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $192,964 2,591,320 kWh $0.07
Electricity Demand $90,380 5,713 kW-months/year $15.82
Electricity Fees $20,686 - $ -
Natural Gas $76,390 10,353 MMBtu $7.38
LPG $22,721 714 MMBtu $31.80
TOTAL ENERGY COSTS $403,441
RECOMMENDED SAVINGS* $112,516 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas LPG Electricity Usage Electricity Fees Natural Gas LPG
$ kWh $ $ $ MMBtu $ MMBtu
01: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$17,535
Cost:
$200,000
$(-5,186) (-70,080) - - - - $22,721 714 $(-5,186)
(-70,080)
kWh
-
-
$
-
-
MMBtu
$22,721
714
MMBtu
02: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$8,629
Cost:
$44,500
$8,629 116,609 - - - - - - $8,629
116,609
kWh
-
-
$
-
-
MMBtu
-
-
MMBtu
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$395
Cost:
-
- - $395 - - - - - -
-
kWh
$395
-
$
-
-
MMBtu
-
-
MMBtu
04: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$40,482
Cost:
$25,536
$(-55) (-749) - - $40,537 5,553 - - $(-55)
(-749)
kWh
-
-
$
$40,537
5,553
MMBtu
-
-
MMBtu
05: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$12,178
Cost:
$45,000
- - - - $12,178 1,666 - - -
-
kWh
-
-
$
$12,178
1,666
MMBtu
-
-
MMBtu
06: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$5,573
Cost:
$2,502
$5,573 77,740 - - - - - - $5,573
77,740
kWh
-
-
$
-
-
MMBtu
-
-
MMBtu
07: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$27,723
Cost:
$35,999
$27,723 372,624 - - - - - - $27,723
372,624
kWh
-
-
$
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$112,516
Cost:
$353,537
$36,684 496,145 $395 - $52,715 7,219 $22,721 714 $36,684
496,145
kWh
$395
-
$
$52,715
7,219
MMBtu
$22,721
714
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
$
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu $ MMBtu
Electricity Usage Electricity Fees Natural Gas LPG Electricity Usage Electricity Fees Natural Gas LPG