IAC logo
IAC Assessment: MU0054
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MU0054
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Michigan State University
Assessment Year 2024
Principal Product Brass/Copper fittings
NAICS 332721 - Precision Turned Product Manufacturing
SIC 3451 - Screw Machine Products
Sales $100,000,000-$500,000,000
# of Employees 350
Plant Area (Sq.Ft.) 190,000
Annual Production 6,000,000 Units
Production Hrs. Annual 7,488
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $593,543 10,349,893 kWh $0.06
Electricity Demand $123,287 25,632 kW-months/year $4.81
Electricity Fees $30,758 - $ -
Natural Gas $48,987 8,220 MMBtu $5.96
Other Gas $465 1 MMBtu $465.23
TOTAL ENERGY COSTS $797,040
RECOMMENDED SAVINGS* $25,870 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$6,955
Cost:
-
$5,577 92,949 $717 149 $662 111 $5,577
92,949
kWh
$717
149
kW-months/year
$662
111
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,402
Cost:
$28,100
$7,445 124,085 $957 199 - - $7,445
124,085
kWh
$957
199
kW-months/year
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,874
Cost:
-
$6,091 101,524 $783 163 - - $6,091
101,524
kWh
$783
163
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,876
Cost:
$1,801
$1,662 27,705 $214 44 - - $1,662
27,705
kWh
$214
44
kW-months/year
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,296
Cost:
-
$1,148 19,139 $148 31 - - $1,148
19,139
kWh
$148
31
kW-months/year
-
-
MMBtu
06: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$118
Cost:
$272
$18 296 $2 0 $98 16 $18
296
kWh
$2
0
kW-months/year
$98
16
MMBtu
07: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE Savings:
$349
Cost:
-
- - - - $349 59 -
-
kWh
-
-
kW-months/year
$349
59
MMBtu
TOTAL RECOMMENDED Savings:
$25,870
Cost:
$30,173
$21,942 365,697 $2,819 586 $1,109 186 $21,942
365,697
kWh
$2,819
586
kW-months/year
$1,109
186
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas