IAC logo
IAC Assessment: MU0060
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MU0060
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Michigan State University
Assessment Year 2025
Principal Product Molded Rubber Goods
NAICS 326291 - Rubber Product Manufacturing for Mechanical Use
SIC 3061 - Mechanical Rubber Goods
Sales $10,000,000-$50,000,000
# of Employees 67
Plant Area (Sq.Ft.) 51,000
Annual Production 360,000,000 Pieces
Production Hrs. Annual 4,095
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $255,744 3,687,201 kWh $0.07
Electricity Demand $241,250 11,559 kW-months/year $20.87
Electricity Fees $33,563 - $ -
Natural Gas $53,531 6,501 MMBtu $8.23
Other Gas $1,009 1 MMBtu $1,008.86
TOTAL ENERGY COSTS $585,096
RECOMMENDED SAVINGS* $328,559 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Primary Product By-product Production Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Primary Product By-product Production
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $ $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$328
Cost:
-
$153 2,185 $175 8 - - - - - - - - - - $153
2,185
kWh
$175
8
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING Savings:
$126,131
Cost:
$8,400
$5,151 73,582 $4,500 216 - - - - - - - - $116,480 - $5,151
73,582
kWh
$4,500
216
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
$116,480
-
$
03: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$1,517
Cost:
$1,184
- - - - $1,517 184 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,517
184
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$19,778
Cost:
$24,085
$10,556 150,797 $9,222 442 - - - - - - - - - - $10,556
150,797
kWh
$9,222
442
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$76,249
Cost:
$151,800
- - - - - - - - - - - - $76,249 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
$76,249
-
$
06: 3.2172 USE AUTOMATIC CLEANING EQUIPMENT Savings:
$44,873
Cost:
$110,000
$162 2,314 $142 7 $1,669 202 - - - - - - $42,900 - $162
2,314
kWh
$142
7
kW-months/year
$1,669
202
MMBtu
-
-
$
-
-
$
-
-
$
$42,900
-
$
07: 3.7112 USE SQUEEGEES, MOPS, AND VACUUMS FOR FLOOR CLEANING Savings:
$1,733
Cost:
$5,000
- - - - - - $1,733 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,733
-
$
-
-
$
-
-
$
-
-
$
08: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$1,220
Cost:
$5,000
- - - - - - - - $1,220 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$1,220
-
$
-
-
$
-
-
$
09: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$14,407
Cost:
$66,000
$5,166 73,797 $9,241 443 - - - - - - - - - - $5,166
73,797
kWh
$9,241
443
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
10: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$42,322
Cost:
$490,355
$30,300 216,426 - - - - - - - - $12,022 - - - $30,300
216,426
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$12,022
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$328,559
Cost:
$861,824
$51,487 519,101 $23,281 1,115 $3,186 386 $1,733 - $1,220 - $12,022 - $235,629 - $51,487
519,101
kWh
$23,281
1,115
kW-months/year
$3,186
386
MMBtu
$1,733
-
$
$1,220
-
$
$12,022
-
$
$235,629
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Primary Product By-product Production Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Primary Product By-product Production