Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Michigan State University |
---|---|
Assessment Year | 2025 |
Principal Product | Carbon steel, Aluminum steel and stainless Steel |
NAICS | 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 65 |
Plant Area (Sq.Ft.) | 187,000 |
Annual Production | 73,000 Tons |
Production Hrs. Annual | 4,420 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $75,845 | 819,786 | kWh | $0.09 |
Electricity Demand | $22,321 | 3,827 | kW-months/year | $5.83 |
Electricity Fees | $18,592 | - | $ | - |
Natural Gas | $28,029 | 4,008 | MMBtu | $6.99 |
Other Gas | $2,813 | 1 | MMBtu | $2,812.59 |
TOTAL ENERGY COSTS | $147,600 | |||
RECOMMENDED SAVINGS* | $10,522 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8122 USE UTILITY CONTROLLED POWER MANAGEMENT |
Savings: $5,350 Cost: - |
- | - | - | - | - | - | - | - | $5,350 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$5,350 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $1,332 Cost: $6,432 |
- | - | - | - | - | - | - | - | $1,332 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$1,332 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $121 Cost: $177 |
$94 | 1,007 | $28 | 5 | - | - | - | - | - | - |
$94 1,007 kWh |
$28 5 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $330 Cost: $75 |
$282 | 3,037 | $48 | 8 | - | - | - | - | - | - |
$282 3,037 kWh |
$48 8 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $173 Cost: $1,250 |
$159 | 1,708 | $14 | 2 | - | - | - | - | - | - |
$159 1,708 kWh |
$14 2 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $881 Cost: - |
$251 | 2,700 | $630 | 108 | - | - | - | - | - | - |
$251 2,700 kWh |
$630 108 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $660 Cost: - |
$499 | 5,370 | $160 | 28 | - | - | - | - | - | - |
$499 5,370 kWh |
$160 28 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $150 Cost: $296 |
$113 | 1,217 | $36 | 6 | - | - | - | - | - | - |
$113 1,217 kWh |
$36 6 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $545 Cost: $348 |
$402 | 4,321 | $143 | 25 | - | - | - | - | - | - |
$402 4,321 kWh |
$143 25 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7423 REDUCE HEAT GAIN BY WINDOW TINTING |
Savings: $550 Cost: $6,426 |
$491 | 5,275 | $59 | 10 | - | - | - | - | - | - |
$491 5,275 kWh |
$59 10 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS |
Savings: $6 Cost: $65 |
$1 | 5 | $0 | 0 | - | - | $6 | 1 | - | - |
$1 5 kWh |
$0 0 kW-months/year |
- - $ |
$6 1 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE |
Savings: $185 Cost: $352 |
- | - | - | - | - | - | $185 | 27 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$185 27 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE |
Savings: $61 Cost: $152 |
- | - | - | - | - | - | $61 | 9 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$61 9 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $178 Cost: - |
- | - | - | - | $178 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$178 - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $10,522 Cost: $15,573 |
$2,292 | 24,640 | $1,118 | 192 | $178 | - | $252 | 36 | $6,682 | - | $2,292 24,640 kWh |
$1,118 192 kW-months/year |
$178 - $ |
$252 36 MMBtu |
$6,682 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | One-time Revenue or Avoided Cost |