IAC logo
IAC Assessment: MU0072
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MU0072
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Michigan State University
Assessment Year 2025
Principal Product Copper Carbonate
NAICS 325180 - Other Basic Inorganic Chemical Manufacturing
SIC 2491 - Wood Preserving
Sales <$500,000
# of Employees 60
Plant Area (Sq.Ft.) 40,000
Annual Production 65,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $708,241 8,283,705 kWh $0.09
Electricity Demand $210,900 32,985 kW-months/year $6.39
Electricity Fees $29,110 - $ -
Natural Gas $1,541,831 313,795 MMBtu $4.91
Other Gas $337,590 1 MMBtu $337,589.72
TOTAL ENERGY COSTS $2,827,672
RECOMMENDED SAVINGS* $165,491 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS Savings:
$161,393
Cost:
$126,876
- - - - $161,393 32,843 - - -
-
kWh
-
-
kW-months/year
$161,393
32,843
MMBtu
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,481
Cost:
$960
$1,290 15,177 $191 21 - - - - $1,290
15,177
kWh
$191
21
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$38
Cost:
$271
- - - - $38 8 - - -
-
kWh
-
-
kW-months/year
$38
8
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,343
Cost:
$9,811
$1,169 13,758 $173 19 - - - - $1,169
13,758
kWh
$173
19
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7134 USE PHOTOCELL CONTROLS Savings:
$138
Cost:
$404
$89 1,052 $49 5 - - - - $89
1,052
kWh
$49
5
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$228
Cost:
-
$105 1,235 $123 13 - - - - $105
1,235
kWh
$123
13
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$231
Cost:
-
$160 1,882 $71 8 - - - - $160
1,882
kWh
$71
8
kW-months/year
-
-
MMBtu
-
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$640
Cost:
-
- - - - - - $640 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$640
-
$
TOTAL RECOMMENDED Savings:
$165,491
Cost:
$138,322
$2,814 33,103 $607 66 $161,431 32,851 $640 - $2,814
33,103
kWh
$607
66
kW-months/year
$161,431
32,851
MMBtu
$640
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes